BVR PROJECT LIST
HEAVY MACHINERY WORK
PRE-CAST CONCRETE BRIDGES & CULVERTS
PRE-CAST CONCRETE NOISE BARRIERS
PRE-CAST CONCRETE RETAINING WALLS
SPECIALTY CONCRETE REPAIR & CONSTRUCTION
SHOTCRETE REPAIR OF BRIDGE SUBSTRUCTURES
SHOTCRETE REPAIR OF CONCRETE WALLS & BEAM CONSTRUCTION
SHOTCRETE REPAIR OF PARKING GARAGE STRUCTURES
SPECIALTY MASONRY & STONE MASONRY
STEEL WORK
OTHER PROJECTS

BVR CONSTRUCTION COMPANY, INC.

PROJECT EXPERIENCE LIST
A list of significant representative projects completed or projects currently under construction.

2009-2010
TIOGA CONSTRUCTION COMPANY – NEW YORK STATE THRUWAY AUTHORITY
PROJECT: TAS-08-8C/D213758 – REHABILITATION OF LOCK 05, TOWN OF MINETTO, AND LOCK 08, TOWN OF OSWEGO, OSWEGO COUNTY, N.Y.
Subcontract, $1,250,000.

  • Furnished and installed quoin plates and pivot

  • Furnished quoin socket (to be installed by others)

  • Furnished and installed quoin and miter timbers

  • Removed and rehabilitated drive machinery, counterweight, and drive chains

  • Furnished and installed 650 feet of handrail with cast iron “bulb fittings” to give the structure relative historic features

  • Rehabilitated machinery cabinets to appropriate historic standards

2008-2010
AMERICAN BRIDGE COMPANY – NEW YORK STATE THRUWAY AUTHORITY
PROJECT: TAN-08-30B – REHABILITATION OF SOUTH GRAND ISLAND BRIDGES
Subcontract, $6,200,000.

  • Performed concrete repair at all bridge substructures

2009
YARUSSI CONSTRUCTION, INC.
PROJECT: NIAGARA COUNTY EMERGENCY REPAIR OF WILSON BURT ROAD BRIDGE AND EIGHTEEN MILE CREEK
Subcontract, $274,000.

  • Furnished and erected steel support system to support bridge span over reservoir where concrete pier was failing

2008-2009
SEALAND CONTRACTORS CORPORATION – NEW YORK STATE DEPARTMENT OF TRANSPORTATION
PROJECT: D260481 – REHABILITATION AND RECONSTRUCTION ON I-490
Subcontract, $325,000.

  • Erected all new overhead sign structures and removed existing overhead sign structures

2007-2009
TIOGA CONSTRUCTION COMPANY – NEW YORK STATE THRUWAY AUTHORITY
PROJECT: 07-20C/D213616 – REHABILITATION OF MOVEABLE DAM 10 AT LOCK E-14
Subcontract, $436,000.

  • Fabricated and installed steel stairs, ladders, and handrail with cast iron “bulb type” fittings to give structure relative historic features

2007-2009
NEW YORK STATE THRUWAY AUTHORITY
PROJECT: 07-58C/D213752
Prime contract, $908,000.

  • Fabricated and delivered 175 7 by 20 by 2 feet dredge pipe pontoons

2004-2009
CD PERRY AND SONS, INC. – NEW YORK STATE THRUWAY AUTHORITY
PROJECT: TAA 04-29C – REHABILITATION OF MOVEABLE DAM 6 AT LOCK E-10 AT ERIE CANAL M.P. E-189.18
Subcontract, $360,000.

  • Furnished and installed 2,000 LF of handrail with cast iron “bulb type” fittings to give structure relative historic features

2008
CRANE HOGAN STRUCTURAL SYSTEMS, INC. – NEW YORK STATE DEPARTMENT OF TRANSPORTATION
PROJECT: D260586
Subcontract, $105,000.

  • Erected new steel girders for Route 96 bridge across Ontario Central Railroad

2008
COLD SPRING CONSTRUCTION COMPANY – NEW YORK STATE DEPARTMENT OF TRANSPORTATION
PROJECT: D260140 – CONSTRUCTION OF U.S. ROUTE 219
Subcontract, $150,000.

  • Placed shotcrete around steel arch abutments of new bridge over Cattaraugus Creek and gorge

  • Shotcrete was used to protect weak shale from weather

2008
CONSTELLATION ENERGY – GINNA NUCLEAR PLANT – CSB UTILITY WORK
Prime contract, $508,000.

  • Utility modification and removal

  • Sitework required as part of project modifying contaminated storage building

2008
CRANE HOGAN STRUCTURAL SYSTEMS, INC. – NEW YORK STATE DEPARTMENT OF TRANSPORTATION
PROJECT: D260586
Subcontract, $105,000.

  • Erected new steel girders for Route 96 bridge across Ontario Central Railroad

2008
MONROE COUNTY, N.Y.
PROJECT: REDMAN ROAD CULVERTS
Prime contract, $187,000.

  • Furnished and installed two new precast concrete structures

2008
ROCHESTER GAS AND ELECTRIC
PROJECT: STATION 5 SECTOR GATE 3
Prime contract, $440,000.

  • Rehabilitated and performed upgrades for 17 foot high by 100 foot long sector gate at Station 5 dam

  • Performed steel, mechanical, and concrete modifications and new construction

2008
AMTHOR STEEL
PROJECT: CHILDREN’S DAYCARE CENTER FOR CORNING, INC.
Subcontract, $138,500.

  • Erected structural steel for new children’s center

2008
DANSFORTH MECHANICAL SERVICES – MONROE COUNTY
PROJECT: NORTHWEST QUADRANT WASTEWASTER TREATMENT PLANT AUXILLARY CONTRIFUGE INSTALLATION
Subcontract, $100,000.

  • Constructed a new reinforced concrete mezzanine floor for new equipment

2008
BOUGHTON PARK CORPORATION
PROJECT: BOUGHTON PARK DAM REHABILITATION
Prime contract, $158,000.

  • Repaired concrete spillways and training walls utilizing concrete and cast in place concrete

2008
TOWN OF RUSH, N.Y.
PROJECT: RUSH DAM EMERGENCY REPAIRS
Prime contract, $163,000.

  • Drilled and placed grout into dam and dam apron to fill existing voids

  • Repaired concrete surface spalls and reconstructed dam abutment

2006-2008
TIOGA CONSTRUCTION COMPANY – NEW YORK STATE THRUWAY AUTHORITY
PROJECT: TAS-06-32C/D213513 – REHABILITATION OF DAM AT LOCK E-26 ON THE ERIE CANAL
Subcontract, $225,000.

  • Installed the control gate seals and drive machinery

  • Furnished and installed 750 LF of handrail with cast iron “bulb type” fittings to give structure relative historic features

2004-2007
CRANE HOGAN STRUCTURAL SYSTEMS, INC. – NEW YORK POWER AUTHORITY
PROJECT: ROBERT MOSES POWER PLANT
Subcontract, $3,975,000.

  • Formed and poured over 60,000 SF of vertical and sloped wall patches and over 1,950 LF of vertical and sloped joints with self-consolidating concrete

  • All work was completed from mast climbing scaffolds and suspended scaffolds

2007
NEW YORK POWER AUTHORITY
PROJECT: DRAINAGE TUNNELS DRAINAGE IMPROVEMENTS
Prime contract, $443,000.

  • Drilled overhead 3-inch-diameter holes into surrounding rock up to 300 LF long

2007
YARUSSI CONSTRUCTION, INC. – NIAGARA FALLS BRIDGE COMMISSION
PROJECT: WHIRLPOOL BRIDGE ACROSS NIAGARA RIVER
Subcontract, $261,090.

  • Rehabilitated historic stone abutment for steel arch bridge with 75 cm of shotcrete

2007
KEELER CONSTRUCTION COMPANY – NEW YORK STATE DEPARTMENT OF TRANSPORTATION
PROJECT: D260462 – I-390 GENESEE EXPRESSWAY REHABILITATION, DANSVILLE, N.Y.
Subcontract, $207,000.

  • Rehabilitated interstate bridges in multiple locations, including concrete replacement, sheet applied waterproofing membrane, and curb replacement

  • Furnished the modular expansion joints

2007
MONROE COUNTY, N.Y.
PROJECT: DOPPLER VOR/DME FACILITY AT GREATER ROCHESTER INTERNATIONAL AIRPORT
Prime contract, $800,000.

  • Furnished and installed a 120’ diameter steel structure to support 50 radar antennae used for aircraft navigation

2007
MONROE COUNTY, N.Y.
PROJECT: DOPPLER VOR/DME FACILITY AT GREATER ROCHESTER INTERNATIONAL AIRPORT
Prime contract, $800,000.

  • Furnished and installed a 120’ diameter steel structure to support 50 radar antennae used for aircraft navigation

2007
MONROE COUNTY, N.Y.
PROJECT: GILMORE BRIDGE REPLACEMENT
Prime contract, $420,000.

  • Reconstructed a portion of Gilmore Road in Brockport, N.Y., including the construction of a precast bridge structure

2007
HAYNER HOYT CORPORATION
PROJECT: ST. JOSEPH’S HOSPITAL PARKING GARAGE REHABILITATION
Prime contract, $265,000.

  • Removed asphalt overlay and hot applied waterproofing membrane and replaced with concrete infill on all ramp surfaces

  • Removed and replaced all ramp curbs

  • Performed full depth concrete deck repairs

2007
CRANE HOGAN STRUCTURAL SYSTEMS, INC.
PROJECT: WILSON HOPSITAL PARKING GARAGE REPAIRS, JOHNSON CITY, N.Y.
Subcontract, $146,000.

  • Rehabilitated precast concrete T-beams and C.I.P. concrete columns with wet-mix shotcrete

2006
WEGMANS FOOD MARKETS
PROJECT: MARKET STREET NOISE BARRIER CONSTRUCTION
Prime contract, $353,000.

  • Installed drilled shaft foundations

  • Furnished and installed 5,750 SF of precast noise wall with architectural finish

2006
CRANE HOGAN STRUCTURAL SYSTEMS, INC.
PROJECT: RG&E REPLACEMENT OF CENTRAL AVENUE GATE 5 ON GENESEE RIVER
Subcontract, $191,000.

  • Removed and replaced the #5 control gate at the RG&E Station 2 headgate, including the replacement of the old guide system

2006
MONROE COUNTY
PROJECT: HOLT ROAD CULVERT REPLACEMENT
Prime contract, $256,000.

  • Reconstructed a portion of Holt Road in Webster, N.Y., including placement of a precast concrete box culvert

2006
UCC CONSTRUCTORS, INC. – NEW YORK STATE DEPARTMENT OF TRANSPORTATION
PROJECT: D260055 – INSTALLATION AND REMOVAL OF OVERHEAD SIGN STRUCTURES IN MONROE COUNTY, N.Y.
Subcontract, $110,000.

  • Removed and replaced overhead sign structures

2006
CD PERRY AND SONS, INC. – NEW YORK STATE DEPARTMENT OF TRANSPORTATION
PROJECT: D260004 – REHABILITATION OF ROUTE 378 BRIDGE OVER THE HUDSON RIVER
Subcontract, $72,000.

  • Performed concrete repairs using wet-mix shotcrete on the bridge piers

2006
ECONOMY PAVING COMPANY, INC.
PROJECT: MINETTO BRIDGE ROAD OVER THE OSWEGO BARGE CANAL AND OSWEGO RIVER
Subcontract, $105,000.

  • Performed concrete repairs with wet-mix shotcrete

  • Cored holes in concrete approach slab for the installation of micro piles

  • Jacked existing approach slab

  • Created a retaining wall using shotcrete and grouted the approach slab to mitigate settling

2006
CRANE HOGAN STRUCTURAL SYSTEMS, INC. – NEW YORK STATE DEPARTMENT OF TRANSPORTATION
PROJECT: D259683 – REHABILITATION OF MOUNT READ BOULEVARD OVER KODAK PARK, ROCHESTER, N.Y.
Subcontract, $86,000.

  • Performed overhead demolition and replacement of bridge deck with shotcrete

2006
HOHL INDUSTRIAL SERVICES, INC. – NEW YORK STATE DEPARTMENT OF TRANSPORTATION
PROJECT: D259852 – REHABILITATION OF INGERSOLL STREET AND WASHINGTON STREET LIFT BRIDGES OVER ERIE CANAL, BATAVIA, N.Y.
Subcontract, $475,000.

  • Performed concrete removal and replacement using self-consolidating concrete

  • Cast in place counterweights for both lift bridges

2006
MONROE COUNTY
PROJECT: REPLACEMENT OF NORTH GREECE ROAD BRIDGE
Prime contract, $245,000.

  • Furnished and installed precast box structure

2006
CRANE HOGAN STRUCTURAL SYSTEMS, INC. – CITY OF ROCHESTER, N.Y.
PROJECT: GENESEE RIVERWAY TRAIL PROJECT – TURNING POINT PARK TO THE O’RORKE BRIDGE – ROCHESTER, N.Y.
Subcontract, $348,000.

  • Prefabricated and installed 86 steel span units over the Genesee River

  • Used a helicopter to place spans in environmentally sensitive areas where access for standard lifting equipment was not available

2005
R&S RAILROAD
PROJECT: RECONSTRUCTION OF RAILROAD CROSSING OVER NEW YORK STATE ROUTE 408 IN MOUNT MORRIS, N.Y.
Prime contract, $30,000.

  • Removed existing railroad crossing and replaced with a reinforced concrete slab crossing

2005
CRANE HOGAN STRUCTURAL SYSTEMS, INC.
PROJECT: RIVER STREET WATERFRONT PUBLIC IMPROVEMENTS
Subcontract, $348,000.

  • Installed ceramic-faced concrete block interior walls for boater’s service building

  • Erected segmental block retaining walls along the shoreline and parking area

  • Installed both brick and exposed aggregate sidewalks, including detectable warning system at the crosswalks

2005
CRANE HOGAN STRUCTURAL SYSTEMS, INC. – NEW YORK STATE DEPARTMENT OF TRANSPORTATION
PROJECT: D259637 – RECONSTRUCTION OF ROUTE 104
Subcontract, $965,000.

  • Installed precast concrete “T” walls, segmental block retaining walls, and mechanically stabilized segmental block retaining walls

  • Work included excavation and backfill

2005
YARUSSI CONSTRUCTION, INC. – NIAGARA FALLS BRIDGE COMMISSION
PROJECT: U.S. RAINBOW BRIDGE BEARING REPLACEMENT
Subcontract, $194,300.

  • Demolished concrete on the pier legs and arches and replaced with either Class A or Class D concrete

2005
LUPINI CONSTRUCTION, INC. – NYSOGS
PROJECT: 41777-C – ATTICA PRISON REHABILITATION
Subcontract, $15,000.

  • Removed train doors and hardware from both ends of the truck lock

2005
HAYWARD BAKER – EASTMAN KODAK COMPANY
PROJECT: HAWKEYE SLOPE STABILIZATION
Subcontract, $24,000.

  • Utilized shotcrete to place concrete pads on a vertical rock face for use with rock anchors

  • All of the access was provided by a crane with a man basket

2005
ROCHESTER GAS AND ELECTRIC
PROJECT: STATION 2 REHAB
Prime contract, $90,870.

  • Replaced structural steel supports and repaired concrete supports with both CIP concrete and shotcrete

2005
LECHASE CONSTRUCTION SERVICES, LLC
PROJECT: PARK RIDGE HOSPITAL ADDITIONS AND ALTERATIONS FOR THE EMERGENCY CENTER
Subcontract, $322,000.

  • Installed a precast concrete façade for three new hospital building additions

2005
THE LANE CONSTRUCTION CORPORATION – NEW YORK STATE DEPARTMENT OF TRANSPORTATION
PROJECT: D259453 – RECONSTRUCTION OF ROUTE 17 IN THE VILLAGE AND TOWN OF HORSEHEADS, N.Y.
Subcontract, $1,796,680.

  • Erected 7,310 SM of precast concrete noise wall

2005
DANT CLAYTON CORPORATION – CITY OF ROCHESTER, N.Y.
PROJECT: PAETEC PARK
Subcontract, $320,000.

  • Installed the bleacher risers, seating, aisle way stairs, and front skirting

2004-2005
OAKGROVE CONSTRUCTION, INC. – NEW YORK STATE DEPARTMENT OF TRANSPORTATION
PROJECT: D25953 – MILLING AND RESURFACING OF ROUTE I-290 IN TOWNS OF TONAWANDA AND AMHERST, N.Y.
Subcontract, $1,149,000.

  • Removed deteriorated concrete from twelve bridge substructures and replaced with shotcrete

  • Made over 1,000 SM of repairs on overpass and underpass abutments and piers along an 8 km stretch of Interstate 290

2000-2005

CRANE HOGAN STRUCTURAL SYSTEMS, INC. – MONROE COUNTY, N.Y.

PROJECT: O’RORKE BRIDGE CONSTRUCTION PROJECT, ROCHESTER, N.Y.

Subcontract, $1,217,545.

  • Provided survey control for locating and embedding in concrete supports and Scherzer track castings

  • Installed and aligned all drive machinery, machinery supports, and tail locks

  • Performed engineering calculations and constructed reinforced 380 CM concrete counterweights in a phased process that balanced bascule steel during erection stages

2002-2004
KEELER CONSTRUCTION COMPANY – NEW YORK STATE DEPARTMENT OF TRANSPORTATION
PROJECT: D259177 – RECONSTRUCTION OF RT. 31 IN THE VILLAGE OF HOLLEY, N.Y.
Subcontract, $442,000.

  • Placed over 1,350 SM of brick paved sidewalks and driveways

  • Installed a segmental block retaining wall

  • Milled existing pavement and pour-stamped, colored concrete crosswalks

2001-2004
VILLAGER CONSTRUCTION, INC. – NEW YORK STATE DEPARTMENT OF TRANSPORTATION
PROJECT: D258746 – ROUTE 21 & 31 OVERLAP IN THE VILLAGE OF PALMYRA, N.Y.
Subcontract, $349,680.

  • Rehabilitated downtown Palmyra, N.Y., including over 1,200 SM of precast concrete pavers and 1,500 SM of exposed aggregate concrete sidewalk and crosswalks

2004
VILLAGE OF LYONS, N.Y.
PROJECT: MONTEZUMA STREET BRIDGE REPLACEMENT
Prime contract, $102,000.

  • Removed and disposed of existing bridge and replaced it with precast concrete span units

2004
KEELER CONSTRUCTION COMPANY – NEW YORK STATE DEPARTMENT OF TRANSPORTATION
PROJECT: D259415 – RECONSTRUCTION OF ROUTE 252 AND ROUTE 383 INTERSECTION
Subcontract, $677,000.

  • Installed a wire mesh retaining wall with CIP concrete face

  • Erected a precast concrete noise wall

2004
CRANE HOGAN STRUCTURAL SYSTEMS, INC. – NEW YORK STATE DEPARTMENT OF TRANSPORTATION
PROJECT: D259477 – BRIDGE REHABILITATION PROJECT FOR VARIOUS BRIDGES ON INTERSTATE 81 & 690, SYRACUSE, N.Y.
Subcontract, $87,000.

  • Applied shotcrete to an I-81 bridge abutment

2004
CRANE HOGAN STRUCTURAL SYSTEMS, INC. – MONROE COUNTY WATER AUTHORITY
PROJECT: SITE ACCESS IMPROVEMENTS PROJECT NO. 01-S05
Subcontract, $95,000.

  • Sounded existing concrete and made necessary repairs

  • Used shotcrete and cast-in-place methods

2003-2004
SPRINGLAKE INDUSTRIAL AND MARINE
PROJECT: CROSS IRONDEQUOIT PUMP STATION WELL MODIFICATIONS
Subcontract, $105,000.

  • Constructed new reinforced concrete Ogee profile to speed up flow of sewer

2003
YARUSSI CONSTRUCTION, INC.
PROJECT: PORTER ROAD BRIDGE OVER GILL CREEK
Subcontract, $180,000.

  • Removed deteriorated concrete from underside of arch and replaced it with shotcrete

  • Reconstructed the top 5 inches of deck surface with new concrete overlay

2003
NEW YORK POWER AUTHORITY
PROJECT: LEWISTON ROAD BRIDGE OVER RMNPP JOINT REPAIR
Subcontract, $42,000.

  • Repaired various roadway deck joints

2002-2003
OAKGROVE CONSTRUCTION, INC. – NEW YORK STATE DEPARTMENT OF TRANSPORTATION
PROJECT: D258788 – REHABILITATION OF 8 BRIDGES ON I-190 IN NIAGARA COUNTY, N.Y.
Subcontract, $261,000.

  • Removed deteriorated concrete and replaced with shotcrete

2002
NEW YORK STATE THRUWAY AUTHORITY
PROJECT: TAB 02-28C / D213199 – REHABILITATION OF CULVERT 54
Prime contract, $740,717.

  • Emergency contract to grout voids in the Erie Canal

  • Installed cofferdams

  • Drilled and grouted in canal basin and culvert 54

2001-2002
CRANE HOGAN STRUCTURAL SYSTEMS, INC. – NEW YORK STATE THRUWAY AUTHORITY
PROJECT: TAB 99-43C / D212699 – REHABILITATION OF LOCK E34 AND E35, LOCKPORT, N.Y.
Subcontract, $1,300,000.

  • Removed and rehabilitated drive machinery and concrete counterweight

  • Drove chains

  • Installed buffer beam

2001
WYOMING COUNTY
PROJECT: ALMETER ROAD BRIDGE REPLACEMENT
Prime contract, $372,475.

  • Removed existing culvert and replaced with precast concrete box culvert sections

2001
OAKGROVE CONSTRUCTION, INC. – NEW YORK STATE THRUWAY AUTHORITY
PROJECT: TAB 00-45 / D212926 – REHABILITATION OF I-90 FOURTH LANE PROJECT
Subcontract, $449,603.

  • Installed a “mechanically stabilized earth retaining wall system”

2001
KEELER CONSTRUCTION COMPANY – NEW YORK STATE DEPARTMENT OF TRANSPORTATION
PROJECT: D258530 – REPLACEMENT OF ROUTE 15A IN LIVONIA, N.Y. AND ROUTE 31 IN GATES, N.Y.
Subcontract, $130,821.

  • Installed box culvert sections at two locations

2001
MANNING SQUIRES HENNIG CO., INC. – CITY OF ROCHESTER
PROJECT: NEW ROCHESTER PUBLIC SAFETY BUILDING
Subcontract, $861,211.

  • Installed limestone façade, pavers, retaining walls, fencing, landscaping, and trash receptacles

2000
CRANE HOGAN STRUCTURAL SYSTEMS, INC.
PROJECT: CITY OF SYRACUSE MONY PLAZA PARKING GARAGE REPAIRS
Subcontract, $350,000.

  • Applied 17,500 SF of overhead shotcrete to repair garage structure

1999
NEW YORK STATE THRUWAY AUTHORITY
PROJECT: TAB 99-76C / D212766 – REHABILITATION OF BUSHNELL’S BASIN AND CARTERSVILLE GUARD GATES
Prime contract, $1,916,416.

  • Removed 12 inches of deteriorated concrete and replaced it with reinforced concrete at center pier and structure abutments

  • Rehabilitated drive machinery

  • Replaced suspension cables and counterweights

  • Removed and replaced structural steel

  • Painted gates and towers

1999
NEW YORK STATE DEPARTMENT OF TRANSPORTATION
PROJECT: D258089 – REPLACEMENT OF THE DENSMORE ROAD BOX CULVERT OVER SANDY CREEK IN THE TOWN OF GAINES, N.Y.
Prime contract, $417,942.

  • Removed and replaced existing box culvert and water diversion structure

  • Performed paving and site restoration

1999
KEELER CONSTRUCTION COMPANY – NEW YORK STATE DEPARTMENT OF TRANSPORTATION
PROJECT: D257980 – REPLACEMENT OF THREE BRIDGES OVER OTTER CREEK IN ORLEANS COUNTY, N.Y.
Subcontract, $532,298.

  • Placed invert slab concrete, wingwalls, and precast box section at three locations

1999
CRANE HOGAN STRUCTURAL SYSTEMS, INC. – NEW YORK STATE THRUWAY AUTHORITY
PROJECT: TAB 99-39C – REHABILITATION OF COURT STREET DAM IN MONROE COUNTY, N.Y.
Subcontract, $100,000.

  • Removed and installed new components for wier system, prop system, wire ropes, and connections

1998-1999
OAKGROVE CONSTRUCTION, INC. – NEW YORK STATE THRUWAY AUTHORITY
PROJECT: TAN 97-91 / D212459 – REHABILITATION OF I-190 NIAGARA SECTION OF NEW YORK STATE THRUWAY IN BUFFALO, N.Y.
Subcontract, $388,360.

  • Poured concrete footings and walls

  • Removed deteriorating substructure concrete and placed repair concrete

1998-1999
SEALAND CONTRACTORS CORP. – NEW YORK STATE THRUWAY AUTHORITY
PROJECT: TAN 98-23 / D212506 – REHABILITATION OF I-190 NEW YORK STATE THRUWAY AUTHORITY IN BUFFALO, N.Y.
Subcontract, $308,822.

  • Poured concrete footings and walls

  • Removed deteriorating substructure concrete and placed repair concrete on three bridges

  • Completed partial and full depth repairs on the mainline bridge decks

1998-1999
KEELER CONSTRUCTION COMPANY – NEW YORK STATE DEPARTMENT OF TRANSPORTATION
PROJECT: D257623 – REHABILITATION OF ROUTE 31 IN NIAGARA COUNTY
Subcontract, $475,244.

  • Removed and replaced two precast box culverts

  • Placed sidewalks

  • Formed and placed concrete retaining wall

1998
NEW YORK STATE DEPARTMENT OF TRANSPORTATION
PROJECT: D257470 – REHABILITATION OF LAKE ONTARIO STATE PARKWAY BRIDGE OVER SALMON CREEK IN GREECE, N.Y.
Prime contract, $477,871.

  • Supported existing bridge under traffic

  • Demolished existing piers and constructed new reinforced concrete piers

1998
MOLLENBERG-BETZ, INC. – CITY OF BUFFALO SCHOOLS
PROJECT: D257470 – CONVERSION OF EXISTING COAL BUNKERS IN BUFFALO, N.Y.
Subcontract, $246,516.

  • Repaired deteriorated concrete of existing coal bunkers with shotcrete

1998
HERBERT F. DARLING, INC. – NEW YORK STATE THRUWAY AUTHORITY
PROJECT: D257470 – REHABILITATION OF LOCK E-35 ON THE ERIE CANAL IN LOCKPORT, N.Y.
Subcontract, $550,000.

  • Formed and placed concrete in lock walls up to 46 feet high

1997
NYSDOT
PROJECT: D257284 – REHABILITATION OF TRI-WAY BRIDGE OVER THE ERIE CANAL IN LOCKPORT, N.Y.
Prime contract, $340,750.

  • Performed bridge deck surface replacement and underside concrete repairs

1996-1997
NEW YORK STATE THRUWAY AUTHOIRTY
PROJECT: TAB 96-26C – HOLLEY GUARD GATES REHABILITATION, HOLLEY, N.Y.
Prime contract, $916,000.

  • Removed 12 inches of deteriorated concrete and replaced with reinforced concrete at center pier and structure abutments

  • Rehabilitated drive machinery

  • Replaced suspension cables and counterweights

  • Removed and replaced structural steel

  • Painted gates and towers

1996
MANNING SQUIRES HENNIG CO., INC. – CITY OF ROCHESTER, N.Y.
PROJECT: RUNDEL LIBRARY ADDITION
Subcontract, $704,415.

  • Placed and finished 63,000 SF of lightweight aggregate concrete floors

  • Constructed 75 LF of 15 feet wide by 9 feet high concrete tunnel passageway beneath South Avenue

1996
U.C.C. CONSTRUCTORS, INC. – NEW YORK STATE THRUWAY AUTHORITY
PROJECT: REHABILITATION OF THREE GUARD GATES, GASPORT, MEDINA, AND BROCKPORT, N.Y.
Subcontract, $100,000.

  • Removed and replaced 1,000 LF steel pipe handrails with cast iron bulb-type fittings to give structure relative historic features

1994-1996
UNION CONCRETE AND CONSTRUCTION CORPORATION – NEW YORK STATE DEPARTMENT OF TRANSPORTATION
PROJECT: ALBION, N.Y.
Subcontract, $2,165,000.

  • Rehabilitated three lift bridges over NYS Barge Canal

  • Refurbished and replaced bridge drive machinery, sheaves, and cables for three lift bridges

  • Performed cable tension equalization and span balancing

1993-1996
KIEWIT CONSTRUCTION COMPANY – NEW YORK STATE POWER AUTHORITY
PROJECT: ROBERT MOSES NIAGARA POWER PLANT, LEWISTON, N.Y.
Subcontract, $1,400,000.

  • Provided access for concrete wall inspection

  • Involved erection of scaffolding and swinging work platform for inspection of concrete walls up to 115 LF high without access to top of the walls

1993-1995
THE LANE CONSTRUCTION CORPORATION – NEW YORK STATE DEPARTMENT OF TRANSPORTATION
PROJECT: D254552 – CORNING BY-PASS, CORNING, N.Y.
Subcontract, $2,500,000.

  • Furnished and installed concrete foundations

  • Installed 140,000 SF of exposed aggregate precast concrete noise wall

1993-1995
KEELER CONSTRUCTION COMPANY – NEW YORK STATE DEPARTMENT OF TRANSPORTATION
PROJECT: BATAVIA, N.Y. AND HAMLIN, N.Y.
Subcontract, $550,000.

  • Rehabilitated bridge

  • Removed and replaced concrete, including decks