Click on one of our galleries in the list to the right to preview our work.
BVR CONSTRUCTION COMPANY, INC.
PROJECT EXPERIENCE LIST
A list of significant representative projects completed or projects currently under construction.
2009-2010
TIOGA CONSTRUCTION COMPANY – NEW YORK STATE THRUWAY AUTHORITY
PROJECT: TAS-08-8C/D213758 – REHABILITATION OF LOCK 05, TOWN OF MINETTO, AND LOCK 08, TOWN OF OSWEGO, OSWEGO COUNTY, N.Y.
Subcontract, $1,250,000.
-
Furnished and installed quoin plates and pivot
-
Furnished quoin socket (to be installed by others)
-
Furnished and installed quoin and miter timbers
-
Removed and rehabilitated drive machinery, counterweight, and drive chains
-
Furnished and installed 650 feet of handrail with cast iron “bulb fittings” to give the structure relative historic features
-
Rehabilitated machinery cabinets to appropriate historic standards
2008-2010
AMERICAN BRIDGE COMPANY – NEW YORK STATE THRUWAY AUTHORITY
PROJECT: TAN-08-30B – REHABILITATION OF SOUTH GRAND ISLAND BRIDGES
Subcontract, $6,200,000.
2009
YARUSSI CONSTRUCTION, INC.
PROJECT: NIAGARA COUNTY EMERGENCY REPAIR OF WILSON BURT ROAD BRIDGE AND EIGHTEEN MILE CREEK
Subcontract, $274,000.
2008-2009
SEALAND CONTRACTORS CORPORATION – NEW YORK STATE DEPARTMENT OF TRANSPORTATION
PROJECT: D260481 – REHABILITATION AND RECONSTRUCTION ON I-490
Subcontract, $325,000.
2007-2009
TIOGA CONSTRUCTION COMPANY – NEW YORK STATE THRUWAY AUTHORITY
PROJECT: 07-20C/D213616 – REHABILITATION OF MOVEABLE DAM 10 AT LOCK E-14
Subcontract, $436,000.
2007-2009
NEW YORK STATE THRUWAY AUTHORITY
PROJECT: 07-58C/D213752
Prime contract, $908,000.
2004-2009
CD PERRY AND SONS, INC. – NEW YORK STATE THRUWAY AUTHORITY
PROJECT: TAA 04-29C – REHABILITATION OF MOVEABLE DAM 6 AT LOCK E-10 AT ERIE CANAL M.P. E-189.18
Subcontract, $360,000.
2008
CRANE HOGAN STRUCTURAL SYSTEMS, INC. – NEW YORK STATE DEPARTMENT OF TRANSPORTATION
PROJECT: D260586
Subcontract, $105,000.
2008
COLD SPRING CONSTRUCTION COMPANY – NEW YORK STATE DEPARTMENT OF TRANSPORTATION
PROJECT: D260140 – CONSTRUCTION OF U.S. ROUTE 219
Subcontract, $150,000.
2008
CONSTELLATION ENERGY – GINNA NUCLEAR PLANT – CSB UTILITY WORK
Prime contract, $508,000.
2008
CRANE HOGAN STRUCTURAL SYSTEMS, INC. – NEW YORK STATE DEPARTMENT OF TRANSPORTATION
PROJECT: D260586
Subcontract, $105,000.
2008
MONROE COUNTY, N.Y.
PROJECT: REDMAN ROAD CULVERTS
Prime contract, $187,000.
2008
ROCHESTER GAS AND ELECTRIC
PROJECT: STATION 5 SECTOR GATE 3
Prime contract, $440,000.
-
Rehabilitated and performed upgrades for 17 foot high by 100 foot long sector gate at Station 5 dam
-
Performed steel, mechanical, and concrete modifications and new construction
2008
AMTHOR STEEL
PROJECT: CHILDREN’S DAYCARE CENTER FOR CORNING, INC.
Subcontract, $138,500.
2008
DANSFORTH MECHANICAL SERVICES – MONROE COUNTY
PROJECT: NORTHWEST QUADRANT WASTEWASTER TREATMENT PLANT AUXILLARY CONTRIFUGE INSTALLATION
Subcontract, $100,000.
2008
BOUGHTON PARK CORPORATION
PROJECT: BOUGHTON PARK DAM REHABILITATION
Prime contract, $158,000.
2008
TOWN OF RUSH, N.Y.
PROJECT: RUSH DAM EMERGENCY REPAIRS
Prime contract, $163,000.
2006-2008
TIOGA CONSTRUCTION COMPANY – NEW YORK STATE THRUWAY AUTHORITY
PROJECT: TAS-06-32C/D213513 – REHABILITATION OF DAM AT LOCK E-26 ON THE ERIE CANAL
Subcontract, $225,000.
2004-2007
CRANE HOGAN STRUCTURAL SYSTEMS, INC. – NEW YORK POWER AUTHORITY
PROJECT: ROBERT MOSES POWER PLANT
Subcontract, $3,975,000.
-
Formed and poured over 60,000 SF of vertical and sloped wall patches and over 1,950 LF of vertical and sloped joints with self-consolidating concrete
-
All work was completed from mast climbing scaffolds and suspended scaffolds
2007
NEW YORK POWER AUTHORITY
PROJECT: DRAINAGE TUNNELS DRAINAGE IMPROVEMENTS
Prime contract, $443,000.
2007
YARUSSI CONSTRUCTION, INC. – NIAGARA FALLS BRIDGE COMMISSION
PROJECT: WHIRLPOOL BRIDGE ACROSS NIAGARA RIVER
Subcontract, $261,090.
2007
KEELER CONSTRUCTION COMPANY – NEW YORK STATE DEPARTMENT OF TRANSPORTATION
PROJECT: D260462 – I-390 GENESEE EXPRESSWAY REHABILITATION, DANSVILLE, N.Y.
Subcontract, $207,000.
-
Rehabilitated interstate bridges in multiple locations, including concrete replacement, sheet applied waterproofing membrane, and curb replacement
-
Furnished the modular expansion joints
2007
MONROE COUNTY, N.Y.
PROJECT: DOPPLER VOR/DME FACILITY AT GREATER ROCHESTER INTERNATIONAL AIRPORT
Prime contract, $800,000.
2007
MONROE COUNTY, N.Y.
PROJECT: DOPPLER VOR/DME FACILITY AT GREATER ROCHESTER INTERNATIONAL AIRPORT
Prime contract, $800,000.
2007
MONROE COUNTY, N.Y.
PROJECT: GILMORE BRIDGE REPLACEMENT
Prime contract, $420,000.
2007
HAYNER HOYT CORPORATION
PROJECT: ST. JOSEPH’S HOSPITAL PARKING GARAGE REHABILITATION
Prime contract, $265,000.
-
Removed asphalt overlay and hot applied waterproofing membrane and replaced with concrete infill on all ramp surfaces
-
Removed and replaced all ramp curbs
-
Performed full depth concrete deck repairs
2007
CRANE HOGAN STRUCTURAL SYSTEMS, INC.
PROJECT: WILSON HOPSITAL PARKING GARAGE REPAIRS, JOHNSON CITY, N.Y.
Subcontract, $146,000.
2006
WEGMANS FOOD MARKETS
PROJECT: MARKET STREET NOISE BARRIER CONSTRUCTION
Prime contract, $353,000.
-
Installed drilled shaft foundations
-
Furnished and installed 5,750 SF of precast noise wall with architectural finish
2006
CRANE HOGAN STRUCTURAL SYSTEMS, INC.
PROJECT: RG&E REPLACEMENT OF CENTRAL AVENUE GATE 5 ON GENESEE RIVER
Subcontract, $191,000.
2006
MONROE COUNTY
PROJECT: HOLT ROAD CULVERT REPLACEMENT
Prime contract, $256,000.
2006
UCC CONSTRUCTORS, INC. – NEW YORK STATE DEPARTMENT OF TRANSPORTATION
PROJECT: D260055 – INSTALLATION AND REMOVAL OF OVERHEAD SIGN STRUCTURES IN MONROE COUNTY, N.Y.
Subcontract, $110,000.
2006
CD PERRY AND SONS, INC. – NEW YORK STATE DEPARTMENT OF TRANSPORTATION
PROJECT: D260004 – REHABILITATION OF ROUTE 378 BRIDGE OVER THE HUDSON RIVER
Subcontract, $72,000.
2006
ECONOMY PAVING COMPANY, INC.
PROJECT: MINETTO BRIDGE ROAD OVER THE OSWEGO BARGE CANAL AND OSWEGO RIVER
Subcontract, $105,000.
-
Performed concrete repairs with wet-mix shotcrete
-
Cored holes in concrete approach slab for the installation of micro piles
-
Jacked existing approach slab
-
Created a retaining wall using shotcrete and grouted the approach slab to mitigate settling
2006
CRANE HOGAN STRUCTURAL SYSTEMS, INC. – NEW YORK STATE DEPARTMENT OF TRANSPORTATION
PROJECT: D259683 – REHABILITATION OF MOUNT READ BOULEVARD OVER KODAK PARK, ROCHESTER, N.Y.
Subcontract, $86,000.
2006
HOHL INDUSTRIAL SERVICES, INC. – NEW YORK STATE DEPARTMENT OF TRANSPORTATION
PROJECT: D259852 – REHABILITATION OF INGERSOLL STREET AND WASHINGTON STREET LIFT BRIDGES OVER ERIE CANAL, BATAVIA, N.Y.
Subcontract, $475,000.
2006
MONROE COUNTY
PROJECT: REPLACEMENT OF NORTH GREECE ROAD BRIDGE
Prime contract, $245,000.
2006
CRANE HOGAN STRUCTURAL SYSTEMS, INC. – CITY OF ROCHESTER, N.Y.
PROJECT: GENESEE RIVERWAY TRAIL PROJECT – TURNING POINT PARK TO THE O’RORKE BRIDGE – ROCHESTER, N.Y.
Subcontract, $348,000.
2005
R&S RAILROAD
PROJECT: RECONSTRUCTION OF RAILROAD CROSSING OVER NEW YORK STATE ROUTE 408 IN MOUNT MORRIS, N.Y.
Prime contract, $30,000.
2005
CRANE HOGAN STRUCTURAL SYSTEMS, INC.
PROJECT: RIVER STREET WATERFRONT PUBLIC IMPROVEMENTS
Subcontract, $348,000.
-
Installed ceramic-faced concrete block interior walls for boater’s service building
-
Erected segmental block retaining walls along the shoreline and parking area
-
Installed both brick and exposed aggregate sidewalks, including detectable warning system at the crosswalks
2005
CRANE HOGAN STRUCTURAL SYSTEMS, INC. – NEW YORK STATE DEPARTMENT OF TRANSPORTATION
PROJECT: D259637 – RECONSTRUCTION OF ROUTE 104
Subcontract, $965,000.
-
Installed precast concrete “T” walls, segmental block retaining walls, and mechanically stabilized segmental block retaining walls
-
Work included excavation and backfill
2005
YARUSSI CONSTRUCTION, INC. – NIAGARA FALLS BRIDGE COMMISSION
PROJECT: U.S. RAINBOW BRIDGE BEARING REPLACEMENT
Subcontract, $194,300.
2005
LUPINI CONSTRUCTION, INC. – NYSOGS
PROJECT: 41777-C – ATTICA PRISON REHABILITATION
Subcontract, $15,000.
2005
HAYWARD BAKER – EASTMAN KODAK COMPANY
PROJECT: HAWKEYE SLOPE STABILIZATION
Subcontract, $24,000.
2005
ROCHESTER GAS AND ELECTRIC
PROJECT: STATION 2 REHAB
Prime contract, $90,870.
2005
LECHASE CONSTRUCTION SERVICES, LLC
PROJECT: PARK RIDGE HOSPITAL ADDITIONS AND ALTERATIONS FOR THE EMERGENCY CENTER
Subcontract, $322,000.
2005
THE LANE CONSTRUCTION CORPORATION – NEW YORK STATE DEPARTMENT OF TRANSPORTATION
PROJECT: D259453 – RECONSTRUCTION OF ROUTE 17 IN THE VILLAGE AND TOWN OF HORSEHEADS, N.Y.
Subcontract, $1,796,680.
2005
DANT CLAYTON CORPORATION – CITY OF ROCHESTER, N.Y.
PROJECT: PAETEC PARK
Subcontract, $320,000.
2004-2005
OAKGROVE CONSTRUCTION, INC. – NEW YORK STATE DEPARTMENT OF TRANSPORTATION
PROJECT: D25953 – MILLING AND RESURFACING OF ROUTE I-290 IN TOWNS OF TONAWANDA AND AMHERST, N.Y.
Subcontract, $1,149,000.
-
Removed deteriorated concrete from twelve bridge substructures and replaced with shotcrete
-
Made over 1,000 SM of repairs on overpass and underpass abutments and piers along an 8 km stretch of Interstate 290
2000-2005
CRANE HOGAN STRUCTURAL SYSTEMS, INC. – MONROE COUNTY, N.Y.
PROJECT: O’RORKE BRIDGE CONSTRUCTION PROJECT, ROCHESTER, N.Y.
Subcontract, $1,217,545.
-
Provided survey control for locating and embedding in concrete supports and Scherzer track castings
-
Installed and aligned all drive machinery, machinery supports, and tail locks
-
Performed engineering calculations and constructed reinforced 380 CM concrete counterweights in a phased process that balanced bascule steel during erection stages
2002-2004
KEELER CONSTRUCTION COMPANY – NEW YORK STATE DEPARTMENT OF TRANSPORTATION
PROJECT: D259177 – RECONSTRUCTION OF RT. 31 IN THE VILLAGE OF HOLLEY, N.Y.
Subcontract, $442,000.
-
Placed over 1,350 SM of brick paved sidewalks and driveways
-
Installed a segmental block retaining wall
-
Milled existing pavement and pour-stamped, colored concrete crosswalks
2001-2004
VILLAGER CONSTRUCTION, INC. – NEW YORK STATE DEPARTMENT OF TRANSPORTATION
PROJECT: D258746 – ROUTE 21 & 31 OVERLAP IN THE VILLAGE OF PALMYRA, N.Y.
Subcontract, $349,680.
-
Rehabilitated downtown Palmyra, N.Y., including over 1,200 SM of precast concrete pavers and 1,500 SM of exposed aggregate concrete sidewalk and crosswalks
2004
VILLAGE OF LYONS, N.Y.
PROJECT: MONTEZUMA STREET BRIDGE REPLACEMENT
Prime contract, $102,000.
2004
KEELER CONSTRUCTION COMPANY – NEW YORK STATE DEPARTMENT OF TRANSPORTATION
PROJECT: D259415 – RECONSTRUCTION OF ROUTE 252 AND ROUTE 383 INTERSECTION
Subcontract, $677,000.
2004
CRANE HOGAN STRUCTURAL SYSTEMS, INC. – NEW YORK STATE DEPARTMENT OF TRANSPORTATION
PROJECT: D259477 – BRIDGE REHABILITATION PROJECT FOR VARIOUS BRIDGES ON INTERSTATE 81 & 690, SYRACUSE, N.Y.
Subcontract, $87,000.
2004
CRANE HOGAN STRUCTURAL SYSTEMS, INC. – MONROE COUNTY WATER AUTHORITY
PROJECT: SITE ACCESS IMPROVEMENTS PROJECT NO. 01-S05
Subcontract, $95,000.
2003-2004
SPRINGLAKE INDUSTRIAL AND MARINE
PROJECT: CROSS IRONDEQUOIT PUMP STATION WELL MODIFICATIONS
Subcontract, $105,000.
2003
YARUSSI CONSTRUCTION, INC.
PROJECT: PORTER ROAD BRIDGE OVER GILL CREEK
Subcontract, $180,000.
2003
NEW YORK POWER AUTHORITY
PROJECT: LEWISTON ROAD BRIDGE OVER RMNPP JOINT REPAIR
Subcontract, $42,000.
2002-2003
OAKGROVE CONSTRUCTION, INC. – NEW YORK STATE DEPARTMENT OF TRANSPORTATION
PROJECT: D258788 – REHABILITATION OF 8 BRIDGES ON I-190 IN NIAGARA COUNTY, N.Y.
Subcontract, $261,000.
2002
NEW YORK STATE THRUWAY AUTHORITY
PROJECT: TAB 02-28C / D213199 – REHABILITATION OF CULVERT 54
Prime contract, $740,717.
2001-2002
CRANE HOGAN STRUCTURAL SYSTEMS, INC. – NEW YORK STATE THRUWAY AUTHORITY
PROJECT: TAB 99-43C / D212699 – REHABILITATION OF LOCK E34 AND E35, LOCKPORT, N.Y.
Subcontract, $1,300,000.
2001
WYOMING COUNTY
PROJECT: ALMETER ROAD BRIDGE REPLACEMENT
Prime contract, $372,475.
2001
OAKGROVE CONSTRUCTION, INC. – NEW YORK STATE THRUWAY AUTHORITY
PROJECT: TAB 00-45 / D212926 – REHABILITATION OF I-90 FOURTH LANE PROJECT
Subcontract, $449,603.
2001
KEELER CONSTRUCTION COMPANY – NEW YORK STATE DEPARTMENT OF TRANSPORTATION
PROJECT: D258530 – REPLACEMENT OF ROUTE 15A IN LIVONIA, N.Y. AND ROUTE 31 IN GATES, N.Y.
Subcontract, $130,821.
2001
MANNING SQUIRES HENNIG CO., INC. – CITY OF ROCHESTER
PROJECT: NEW ROCHESTER PUBLIC SAFETY BUILDING
Subcontract, $861,211.
-
Installed limestone façade, pavers, retaining walls, fencing, landscaping, and trash receptacles
2000
CRANE HOGAN STRUCTURAL SYSTEMS, INC.
PROJECT: CITY OF SYRACUSE MONY PLAZA PARKING GARAGE REPAIRS
Subcontract, $350,000.
1999
NEW YORK STATE THRUWAY AUTHORITY
PROJECT: TAB 99-76C / D212766 – REHABILITATION OF BUSHNELL’S BASIN AND CARTERSVILLE GUARD GATES
Prime contract, $1,916,416.
-
Removed 12 inches of deteriorated concrete and replaced it with reinforced concrete at center pier and structure abutments
-
Rehabilitated drive machinery
-
Replaced suspension cables and counterweights
-
Removed and replaced structural steel
-
Painted gates and towers
1999
NEW YORK STATE DEPARTMENT OF TRANSPORTATION
PROJECT: D258089 – REPLACEMENT OF THE DENSMORE ROAD BOX CULVERT OVER SANDY CREEK IN THE TOWN OF GAINES, N.Y.
Prime contract, $417,942.
1999
KEELER CONSTRUCTION COMPANY – NEW YORK STATE DEPARTMENT OF TRANSPORTATION
PROJECT: D257980 – REPLACEMENT OF THREE BRIDGES OVER OTTER CREEK IN ORLEANS COUNTY, N.Y.
Subcontract, $532,298.
1999
CRANE HOGAN STRUCTURAL SYSTEMS, INC. – NEW YORK STATE THRUWAY AUTHORITY
PROJECT: TAB 99-39C – REHABILITATION OF COURT STREET DAM IN MONROE COUNTY, N.Y.
Subcontract, $100,000.
1998-1999
OAKGROVE CONSTRUCTION, INC. – NEW YORK STATE THRUWAY AUTHORITY
PROJECT: TAN 97-91 / D212459 – REHABILITATION OF I-190 NIAGARA SECTION OF NEW YORK STATE THRUWAY IN BUFFALO, N.Y.
Subcontract, $388,360.
1998-1999
SEALAND CONTRACTORS CORP. – NEW YORK STATE THRUWAY AUTHORITY
PROJECT: TAN 98-23 / D212506 – REHABILITATION OF I-190 NEW YORK STATE THRUWAY AUTHORITY IN BUFFALO, N.Y.
Subcontract, $308,822.
-
Poured concrete footings and walls
-
Removed deteriorating substructure concrete and placed repair concrete on three bridges
-
Completed partial and full depth repairs on the mainline bridge decks
1998-1999
KEELER CONSTRUCTION COMPANY – NEW YORK STATE DEPARTMENT OF TRANSPORTATION
PROJECT: D257623 – REHABILITATION OF ROUTE 31 IN NIAGARA COUNTY
Subcontract, $475,244.
1998
NEW YORK STATE DEPARTMENT OF TRANSPORTATION
PROJECT: D257470 – REHABILITATION OF LAKE ONTARIO STATE PARKWAY BRIDGE OVER SALMON CREEK IN GREECE, N.Y.
Prime contract, $477,871.
1998
MOLLENBERG-BETZ, INC. – CITY OF BUFFALO SCHOOLS
PROJECT: D257470 – CONVERSION OF EXISTING COAL BUNKERS IN BUFFALO, N.Y.
Subcontract, $246,516.
1998
HERBERT F. DARLING, INC. – NEW YORK STATE THRUWAY AUTHORITY
PROJECT: D257470 – REHABILITATION OF LOCK E-35 ON THE ERIE CANAL IN LOCKPORT, N.Y.
Subcontract, $550,000.
1997
NYSDOT
PROJECT: D257284 – REHABILITATION OF TRI-WAY BRIDGE OVER THE ERIE CANAL IN LOCKPORT, N.Y.
Prime contract, $340,750.
1996-1997
NEW YORK STATE THRUWAY AUTHOIRTY
PROJECT: TAB 96-26C – HOLLEY GUARD GATES REHABILITATION, HOLLEY, N.Y.
Prime contract, $916,000.
-
Removed 12 inches of deteriorated concrete and replaced with reinforced concrete at center pier and structure abutments
-
Rehabilitated drive machinery
-
Replaced suspension cables and counterweights
-
Removed and replaced structural steel
-
Painted gates and towers
1996
MANNING SQUIRES HENNIG CO., INC. – CITY OF ROCHESTER, N.Y.
PROJECT: RUNDEL LIBRARY ADDITION
Subcontract, $704,415.
-
Placed and finished 63,000 SF of lightweight aggregate concrete floors
-
Constructed 75 LF of 15 feet wide by 9 feet high concrete tunnel passageway beneath South Avenue
1996
U.C.C. CONSTRUCTORS, INC. – NEW YORK STATE THRUWAY AUTHORITY
PROJECT: REHABILITATION OF THREE GUARD GATES, GASPORT, MEDINA, AND BROCKPORT, N.Y.
Subcontract, $100,000.
1994-1996
UNION CONCRETE AND CONSTRUCTION CORPORATION – NEW YORK STATE DEPARTMENT OF TRANSPORTATION
PROJECT: ALBION, N.Y.
Subcontract, $2,165,000.
-
Rehabilitated three lift bridges over NYS Barge Canal
-
Refurbished and replaced bridge drive machinery, sheaves, and cables for three lift bridges
-
Performed cable tension equalization and span balancing
1993-1996
KIEWIT CONSTRUCTION COMPANY – NEW YORK STATE POWER AUTHORITY
PROJECT: ROBERT MOSES NIAGARA POWER PLANT, LEWISTON, N.Y.
Subcontract, $1,400,000.
1993-1995
THE LANE CONSTRUCTION CORPORATION – NEW YORK STATE DEPARTMENT OF TRANSPORTATION
PROJECT: D254552 – CORNING BY-PASS, CORNING, N.Y.
Subcontract, $2,500,000.
-
Furnished and installed concrete foundations
-
Installed 140,000 SF of exposed aggregate precast concrete noise wall
1993-1995
KEELER CONSTRUCTION COMPANY – NEW YORK STATE DEPARTMENT OF TRANSPORTATION
PROJECT: BATAVIA, N.Y. AND HAMLIN, N.Y.
Subcontract, $550,000.
|