BVR CONSTRUCTION COMPANY, INC. - PROJECT EXPERIENCE LIST
A list of significant representative projects completed or projects currently under construction.
2009-2010
TIOGA CONSTRUCTION COMPANY− NEW YORK STATE THRUWAY AUTHORITY−TAS 08−8C−D213758−REHABILITATION OF LOCK 05, TOWN OF MINETTO AND LOCK 08, TOWN OF OSWEGO, OSWEGO COUNTY, NY: Subcontract; furnish and install quoin plates and pivot; furnish quoin socket to be installed by others; furnish and install quoin and miter timbers; remove and rehabilitate drive machinery; counterweight; drive chains; furnish and install 650 feet of handrail with cast iron “bulb type” fittings to give structure relative historic features; rehabilitate machinery cabinets to appropriate historic standards; $1,250,000
2009
YARUSSI CONSTRUCTION, INC. – NIAGARA COUNTY EMERGENCY REPAIR OF WILSON BURT ROAD BRIDGE AND EIGHTEEN MILE CREEK: Subcontract; furnish and erect steel support system to support bridge span over reservoir where concrete pier is failing; $274,000
2008 - 2010
AMERICAN BRIDGE COMPANY – NEW YORK STATE THRUWAY AUTHORITY. TAN 08-30B− REHABILITATION OF SOUTH GRAND ISLAND BRIDGES: Subcontract; perform concrete repair at all bridge substructures; $6,200,000
2007 - 2009
TIOGA CONSTRUCTION COMPANY, INC. –NEW YORK STATE THRUWAY AUTHORITY− TAA 07-20C/D213616− REHABILITATION OF MOVEABLE DAM 10 AT LOCK E-14: Subcontract; fabrication and installation of steel stairs, ladders and handrail with cast iron “bulb type” fittings to give structure relative historic features; $436,000
2007-2009
NEW YORK STATE THRUWAY AUTHORITY− TAA 07-58C/D213752: Prime Contract; fabricate and deliver of 175 Ea. 7 ft by 20 ft by 2 ft dredge pipe pontoons; $908,000.
2008-2009
SEALAND CONTRACTORS CORP – NYSDOT D260481; REHABILITATION AND RECONSTRUCTION ON I-490: Subcontract; erect all new overhead sign structures and remove existing overhead sign structures; $325,000.
2008
CRANE HOGAN STRUCTURAL SYSTEMS, INC. – NYSDOT D260586: Subcontract; erection of new steel girders for Route 96 bridge across Ontario Central Railroad; $105,000
2008
COLD SPRING CONSTRUCTION COMPANY – NYSDOT D260140 CONSTRUCTION OF U.S. ROUTE 219: Subcontract; place shotcrete around steel arch abutments of new bridge over Cattaraugus Creek and gorge. Shotcrete was used to protect weak shale from weather; $150,000.
2008
CONSTELLATION ENERGY – GINNA NUCLEAR PLANT – CSB UTILITY WORK: Prime Contract; utility modification and removal and sitework required as part of project modifying contaminated storage building; $508,000.
2008
MONROE COUNTY, N.Y.−REDMAN ROAD CULVERTS: Prime Contract; furnished and installed two new precast concrete structures; $187,000.
2008
ROCHESTER GAS AND ELECTRIC – STATION 5 SECTOR GATE 3: Prime Contract; rehabilitate and perform upgrades for 17 ft. high by 100 ft. long sector gate at Station 5 Dam; performed steel, mechanical, and concrete modifications and new construction; $440,000.
2008
AMTHOR STEEL – CHILDREN’S DAYCARE CENTER FOR CORNING, INC.: Subcontract; Erected structural steel for new children’s center; $138,500.
2008
DANFORTH MECHANICAL SERVICES – MONROE COUNTY - NORTHWEST QUADRANT WASTEWATER TREATMENT PLANT AUXILLARY CONTRIFUGE INSTALLATION: Subcontract; constructed a new reinforced concrete mezzanine floor for new equipment; $100,000.
2008
BOUGHTON PARK CORPORATION – BOUGHTON PARK DAM REHABILITATION: Prime Contract; repaired concrete spillways and training walls, utilizing shotcrete and cast in place concrete; $158,000
2008
TOWN OF RUSH, N.Y. – RUSH DAM EMERGENCY REPAIRS: Prime Contract; drilled and placed grout into dam and dam apron to fill existing voids. Repaired concrete surface spalls and reconstructed dam abutment; $163,000
2004-2009
CD PERRY AND SONS, INC. – NYSTA TAA 04-29C−REHABILITATION OF MOVEABLE DAM 6 AT LOCK E-10 AT ERIE CANAL M.P. E-189.18: Subcontract; furnish and install 2,000 LF of handrail with cast iron “bulb type” fittings to give structure relative historic features; $360,000
2004-2007
CRANE HOGAN STRUCTURAL SYSTEMS, INC. – NEW YORK POWER AUTHORITY− ROBERT MOSES POWER PLANT: Subcontract; form and pour over 60,000 SF of vertical and sloped wall patches and over 1,950 LF of vertical and sloped joints with self consolidating concrete. All of the work was completed from mast climbing scaffolds and suspended scaffolds; $3,975,000.
2006-2008
TIOGA CONSTRUCTION CO., INC.− NYSTA−TAS 06-32C/D213513– REHABILITATION OF DAM AT LOCK E-26 ON THE ERIE CANAL: Subcontract; install the control gate seals and drive machinery; furnish and install 750 LF of handrail with cast iron “bulb type” fittings to give structure relative historic features; $225,000
2007
NEW YORK POWER AUTHORITY - DRAINAGE TUNNELS DRAINAGE IMPROVEMENTS: Prime Contact; work included drilling overhead 3 inch diameter holes into surrounding rock up to 300 LF long; $443,000.
2007
YARUSSI CONSTRUCTION, INC. – NIAGARA FALLS BRIDGE COMMISSION, WHIRLPOOL BRIDGE ACROSS NIAGARA RIVER: Subcontract; rehabilitate historic stone abutment for steel arch bridge with 75 cm of shotcrete; $261,090.
2007
KEELER CONSTRUCTION COMPANY – NYSDOT D260462− I-390, GENESEE EXPRESSWAY REHABILITATION, DANSVILLE, NY: Subcontract; rehabilitate interstate bridges in multiple locations, including concrete replacement, sheet applied waterproofing membrane, curb replacement and furnishing the modular expansion joints.
2007
MONROE COUNTY – Construct Doppler VOR/DME Facility – Contract 1 at the Greater Rochester International AIRPORT: Prime Contract; furnish and install a 120’ diamerer steel structure to support 50 radar antenna used for aircraft navigation; $800,000.
2007
MONROE COUNTY – GILMORE ROAD BRIDGE REPLACEMENT: Prime Contract; reconstruct a portion of Gilmore Road in Brockport, NY, including construction of a precast bridge structure; $420,000.
2007
HAYNER HOYT CORPORATION – ST. JOSEPHS HOSPITAL PARKING GARAGE REHABILITATION: Prime Contract; remove asphalt overlay and hot applied waterproofing membrane, and replace with concrete infill on all ramp surfaces. Remove and replace all ramp curbs; full depth concrete deck repairs; $265,000.
2007
CRANE HOGAN STRUCTURAL SYSTEMS, INC. – WILSON HOPSITAL PARKING GARAGE REPAIRS− JOHNSON CITY, NY: Subcontract; rehabilitate precast concrete T− beams and C.I.P concrete columns with wet-mix shotcrete; $146,000.
2006
WEGMANS FOOD MARKETS –MARKET STREET NOISE BARRIER CONSTRUCTION: Prime Contract; install drilled shaft foundations; furnish and install 5,750 SF of precast noise wall with architectural finish; $353,000.
2006
CRANE HOGAN STRUCTURAL SYSTEMS, INC. – RG&E REPLACEMENT OF CENTRAL AVENUE GATE 5 ON GENESEE RIVER: Subcontract; remove and replace the #5 control gate at the RG&E Station 2 headgate, including the replacement of the old guide system; $191,000.
2006
MONROE COUNTY – HOLT ROAD CULVERT REPLACEMNT: Prime Contract; reconstruct a portion of Holt Road in Webster, NY, including placement of a precast concrete box culvert; $256,000.
2006
UCC CONSTRUCTORS, INC. – NYSDOT D260055-INSTALLATION AND REMOVAL OF OVERHEAD SIGN STRUCTURES IN MONROE COUNTY: Subcontract; remove and replace overhead sign structures; $110,000.
2006
CD PERRY AND SONS, INC. – NYSDOT D260004-REHABILITATION OF ROUTE 378 BRIDGE OVER THE HUDSON RIVER: Subcontract; perform concrete repairs using wet-mix shotcrete on the bridge piers; $72,000.
2006
ECONOMY PAVING CO., INC. – MINETTO BRIDGE ROAD OVER THE OSWEGO BARGE CANAL AND OSWEGO RIVER: Subcontract; perform concrete repairs with wet-mix shotcrete; core holes in concrete approach slab to install micro piles; jack existing approach slab; create a retaining wall using shotcrete and grout the approach slab to mitigate settling; $105,000.
2006
CRANE HOGAN STRUCTURAL SYSTEMS, INC. – NYSDOT D259683- REHABILITATION OF MOUNT READ BLVD OVER KODAK PARK− ROCHESTER, NY: Subcontract; overhead demolition and replace of bridge deck concrete with shotcrete; $86,000.
2006
HOHL INDUSTRIAL SERVICES, INC.−NYSDOT D259852−Rehabilitation of Ingersoll Street and Washington Street Lift Bridges over Erie Canal, bATAVIA ny: Subcontract; concrete removal and replacement using self consolidating concrete; cast in place counterweights for both lift bridges; $475,000.
2006
MONROE COUNTY – REPLACEMENT OF NORTH GREECE ROAD BRIDGE: Prime Contract; furnish and install precast box structure; $245,000.
2006
CRANE HOGAN STRUCTURAL SYSTEMS, INC – CITY OF ROCHESTER, NY − Genesee Riverway Trail Project−Turning Point Park to The O' Rorke Bridge, ROCHESTER, NY: Subcontract; prefabricate and install 86 steel span units over the Genesee River. A helicopter was utilized to place spans in environmentally sensitive areas where access for standard lifting equipment was not available; $348,000.
2005
R&S RAILROAD – RECONSTRUCT RAILROAD CROSSING OVER NYS RT. 408 IN MOUNT MORRIS, NY: Prime Contract; remove existing railroad crossing and replace with a reinforced concrete slab crossing.
2005
CRANE HOGAN STRUCTURAL SYSTEMS, INC – RIVER STREET WATERFRONT PUBLIC IMPROVEMENTS: Subcontract; install ceramic faced concrete block interior walls of the boater’s service building. Erect segmental block retaining walls along the shoreline and parking area. Install both brick and exposed aggregate sidewalks including detectable warning system at the crosswalks; $348,000.
2005
CRANE HOGAN STRUCTURAL SYSTEMS, INC− NYSDOT D259637– RECONSTRUCTION OF ROUTE 104: Subcontract; install precast concrete “T” walls; segmental block retaining walls and mechanically stabilized segmental block retaining walls, including excavation and backfill; $965,000.
2005
YARUSSI CONSTRUCTION, INC.; NIAGARA FALLS BRIDGE COMMISION – US RAINBOW BRIDGE BEARING REPLACEMENT: Subcontract; demolition of concrete on the pier legs and arches and replace with either class Class A concrete or Class D concrete; $194,300.
2005
LUPINI CONSTRUCTION, INC. − NYSOGS 41777-C − ATTICA PRISON REHAB: Subcontract; remove train doors and hardware from both ends of the truck lock; $15,000.
2005
HAYWARD BAKER –EASTMAN KODAK COMPANY - HAWKEYE SLOPE STABALIZIATION: Subcontract; utilized shotcrete to place concrete pads on a vertical rock face for use with rock anchors. All of the access was provided by a crane with a man basket; $24,000.
2005 ROCHESTER GAS AND ELECTRIC – STATION 2 REHAB: Prime contract; replace structural steel supports and repair concrete supports with both CIP concrete and shotcrete; $90,870.
2005
LECHASE CONSTRUCTION SEVICES, LLC – PARK RIDGE HOSPITAL ADDITIONS & ALTERATIONS FOR THE EMERGENCY CENTER: Subcontract; installation of a precast concrete façade for three new hospital building additions; $322,000.
2005
THE LANE CONSTRUCTION CORPORATION –NYSDOT D259453−RECONSTRUCTION OF RT 17 IN THE VILLAGE AND TOWN OF HORSEHEADS, NY: Subcontract; erect 7,310 SM of precast concrete noise wall; $1,796,680.
2005
DANT CLAYTON CORPORATION –CITY OF ROCHESTER, NY - PAETEC PARK; Subcontract; installed the bleacher risers, seating, aisle way stairs and front skirting; $320,000.
2004 - 2005
OAKGROVE CONSTRUCTION, INC. – NYSDOT D259533−MILLING AND RESURFACING RTE I-290 TOWNS OF TONAWANDA AND AMHERST: Subcontract; remove deteriorated concrete from twelve bridge substructures and replace with shotcrete. Over 1,000 SM of repairs were made on overpass and underpass abutments and piers along an 8 km stretch of Interstate 290; $1,149,000.
2000 – 2005
CRANE HOGAN STRUCTURAL SYSTEMS, INC. – MONROE COUNTY −O’RORKE BRIDGE CONSTRUCTION PROJECT − ROCHESTER, NY: Subcontract; provided survey control for locating and embedding in concrete supports, Scherzer track castings, installed and aligned all drive machinery, machinery supports and tail locks. Performed engineering calculations and constructed reinforced concrete counterweights (380 CM Ea.) in a phased process that balanced bascule steel during erection stages; $1,217,545.
2001 – 2004
VILLAGER CONSTRUCTION, INC.− NYSDOT D258746−ROUTE 21 & 31 OVERLAP IN THE VILLAGE OF PALMYRA: Subcontract; a rehabilitation of downtown Palmyra, NY including over 1,200 SM of precast concrete pavers and 1,500 SM of exposed aggregate concrete sidewalk and crosswalks; $349,680.
2002 - 2004
KEELER CONSTRUCTION COMPANY; NYSDOT D259177 – RECONSTRUCTION OF RT. 31 IN THE VILLAGE OF HOLLEY, NY: Subcontract; placement of over 1350 SM of brick paved sidewalks and driveways; installation of a segmental block retaining wall; mill existing pavement and pour stamped, colored concrete crosswalks; $442,000.
2004
VILLAGE OF LYONS, NY – MONTEZUMA STREET BRIDGE REPLACEMENT: Prime contract; remove and dispose of existing bridge and replace with precast concrete span units. $102,000
2004
KEELER CONSTRUCTION COMPANY−NYSDOT D259415 – RECONSTRUCTION OF RT 252 AND RT 383 INTERSECTION: Subcontract; installation of a wire mesh retaining wall with CIP concrete face; erection of precast concrete noise wall; $677,000.
2004 CRANE HOGAN STRUCTURAL SYSTEMS, INC. – MONROE COMMUNITY HOSPITAL UTILITY TUNNEL REPAIR: Subcontract; demolition of concrete and replace with shotcrete in a tunnel carrying steam lines from the Iola Steam Powerhouse to the Monroe Community Hospital.
2004
CRANE HOGAN STRUCTURAL SYSTEMS, INC. – NYSDOT D259477 − BRIDGE REHAB PROJECT VARIOUS BRIDGES ON INTERSTATE 81 & 690 CITY OF SYRACUSE: Subcontract; apply shotcrete to an I-81 bridge abutment; $87,000.
2004
COLD SPRING CONSTRUCTION COMPANY, NEW YORK STATE THRUWAY AUTHORITY TAB03-30C / D213221- LOCK 33 REHABILITATION: Subcontract; 1700 SF of vertical and horizontal concrete repairs utilizing shotcrete methods at lock filling culverts.
2004
CRANE HOGAN STRUCTURAL SYSTEMS, INC.−SITE ACCESS IMPROVEMENTS PROJECT No. 01-S05 − Monroe County Water Authority Subcontract: Subcontract; at Clear Well Tanks sound existing concrete and make necessary repairs; shotcrete and cast-in-place methods used; $95,000.
2003-2004
SPRINGLAKE INDUSTRIAL AND MARINE – CROSS IRONDEQUOIT PUMP STATION WELL MODIFICATIONS: Subcontract; construct new reinforced concrete Ogee profile to speed up flow of sewer; $105,000.
2003
CRANE HOGAN STRUCTURAL SYSTEMS, INC. –JOHNSON CITY, NY − WILSON HOSPITAL PARKING GARAGE: Subcontract; overhead concrete repair utilizing shotcrete methods.
2003
YARUSSI CONSTRUCTION, INC. – PORTER ROAD BRIDGE OVER GILL CREEK: Subcontract; remove deteriorated concrete from underside of arch and replace with shotcrete; reconstruct the top 5 inches of deck surface with new concrete overlay; $180,000.
2003
NEW YORK POWER AUTHORITY- LEWISTON ROAD BRIDGE OVER RMNPP JOINT REPAIR: Subcontract; repair various roadway deck joints; $42,000.
2002-2003
OAKGROVE CONSTRUCTION, INC. – NYSDOT D258788 − REHABILITATE 8 BRIDGES ON I-190 IN NIAGARA COUNTY: Subcontract; remove deteriorated concrete and replace with shotcrete; $261,000.
2002
NEW YORK STATE THRUWAY AUTHORITY TAB 02−28C / D213199 – REHABILIATION OF CULVERT 54: Prime Contract; emergency contract to grout voids in the Erie Canal. Work consisted of installing cofferdams, drilling and grouting in canal basin and culvert 54; $740,717.
2001−2002
CRANE HOGAN STRUCTURAL SYSTEMS, INC. –NYSTA TAB 99−43C / D212699 REHABILIATION OF LOCK E34 AND E35−LOCKPORT, NY: Subcontract; remove and rehabilitate drive machinery; concretecounterweight; drive chains; installation of buffer beam; $1,300,000.
2001
ROCHESTER GAS AND ELECTRIC – STATION 26 DECK REHABILIATION: Prime Contract; remove and replace deteriorated concrete, installation of waterproof membrane.
2001
WYOMING COUNTY – ALMETER ROAD BRIDGE REPLACEMENT:
Prime Contract; remove existing culvert and replace with precast concrete box culvert sections; $372,475.00.
2001
CRANE HOGAN STRUCTURAL SYSTEMS, INC. – CITY OF SYRACUSE ATRIUM PARKING GARAGE CONCRETE REPAIRS UTILIZING SHOTCETE: Subcontract; application of 6,000 LF of overhead shotcrete to repair garage structure; $81,000.
2001 OAKGROVE CONSTRUCTION, INC. – NYSTA TAB 00−45 / D212926 − REHABILITATION OF I-90 4th LANE PROJECT: Subcontract; installation of a “Mechanically Stabilized Earth Retaining Wall System”; $449,603.
2001
KEELER CONSTRUCTION COMPANY – NYSDOT D258530 − REPLACEMENT OF ROUTE 15A IN LIVONIA AND ROUTE 31 IN THE TOWN OF GATES: Subcontract; installation of box culvert sections at two locations; $ 130,821.
2001
MANNING SQUIRES HENNIG CO., INC. – CITY OF ROCHESTER−NEW ROCHESTER PUBLIC SAFETY BUILDING: Subcontract; installation of limestone façade; pavers; retaining walls; fencing; landscaping and trash receptacles; $861,211.
2000
CRANE HOGAN STRUCTURAL SYSTEMS, INC. – CITY OF SYRACUSE MONY PLAZA PARKING GARAGE REPAIRS: Subcontract; application of 17,500 SF of overhead shotcrete to repair garage structure; $350,000.
1999
NEW YORK STATE THRUWAY AUTHORITY TAB 99−76C / D212766 – REHABILIATION OF BUSHNELL’S BASIN AND CARTERSVILLE GUARD GATES: Prime Contract; remove 12 inches of deteriorated concrete and replace with reinforced concrete at center pier and structure abutments; rehabilitate drive machinery; replace suspension cables and counterweights; remove and replace structural steel; paint gates and towers; $1,916,416.
1999
HERBERT F. DARLING, INC. – BUFFALO INNER HARBOR REDEVELOPMENT. NYS ECONOMIC DEVELOPMENT: Subcontract; remove and store stone sculpture monuments; $38,500.
1999
NEW YORK STATE DEPARTMENT OF TRANSPORTATION D258089 − REPLACEMENT OF THE DENSMORE ROAD BOX CULVERT OVER SANDY CREEK IN THE TOWN OF GAINES: Prime Contract; remove and replace existing box culvert, water diversion structure, paving and site restoration; $417,942
1999
KEELER CONSTRUCTION COMPANY - REPLACEMENT OF THREE BRIDGES OVER OTTER CREEK IN ORLEANS COUNTY − NYSDOT D257980: Subcontract; place invert slab concrete, wingwalls and precast box section at three locations; $532,298.
1999
CRANE-HOGAN STRUCTURAL SYSTEMS, INC. - REHABLILATION OF COURT STREET DAM IN MONROE COUNTY − NYSTA TAB 99 −39C: Subcontract; remove and install new components for wier system, prop system, wire ropes and connections
1999
MONROE COUNTY - PLACEMENT OF ENGLISH ROAD BOX CULVERT: Prime Contract; furnish and install a precast box culvert; $51,435.
1999
CITY OF ROME - EAST DOMINICK STREET BRIDGE RENOVATIONS: Prime Contract; remove deteriorating concrete and replace with new shotcrete; $60,000.
1999 ONONDAGA COMMUNITY COLLEGE: Prime Contract; repair existing concrete surfaces as directed, vertical and horizontal; $120,000.
1998
NEW YORK STATE DEPARTMENT OF TRANSPORTATION – D257470− REHABILITION OF LAKE ONTARIO STATE PARKWAY BRIDGE OVER SALMON CREEK IN GREECE, NY: Prime Contract; support existing bridge under traffic, demolition of existing piers and construct new re-inforced concrete piers; $477,871.
1998 - 1999
OAKGROVE CONSTRUCTION, INC. – NYSTA TAN 97−91 / D212459− REHABILITATION OF I-190 NIAGARA SECTION OF NYS THRUWAY IN BUFFALO, NY: Subcontract; Pour concrete footings and walls, remove deteriorating substructure concrete and place repair concrete; $388,360.
1998 - 1999
SEALAND CONTRACTORS CORP. − NYSTA TAN 98−23 / D212506 REHABILIATION OF I-90 NYS THRUWAY AUTHORITY IN BUFFALO, NY: Subcontract; Pour concrete footings and walls, remove deteriorating substructure concrete and place repair concrete on three bridges, completed partial and full depth repairs on the mainline bridge decks; $308,822.
1998 - 1999
KEELER CONSTRUCTION COMPANY − NYSDOT D257623 − REHABILITATION OF ROUTE 31 IN NIAGARA COUNTY− NYSDOT: Subcontract; remove and replace two precast box culverts, place sidewalks, form and place concrete retaining wall; $475,244.
1998
MOLLENBERG-BETZ, INC. − CITY OF BUFFALO SCHOOLS − CONVERSION OF EXISTING COAL BUNKERS IN BUFFALO, NY: Subcontract; repair deteriorated concrete of existing coal bunkers with shotcrete; $246,516.
1998
HERBERT F. DARLING, INC. − NYSTA −REHABILITATION OF LOCK E-35 ON THE ERIE CANAL IN LOCKPORT, NY: Subcontract; form and place concrete in lock walls up to 46 feet high; $550,000.
1997
NEW YORK STATE DEPARTMENT OF TRANSPORTATION− D257284− REHABILIATION OF TRI-WAY BRIDGE OVER THE ERIE CANAL IN LOCKPORT, NY: Prime Contract; bridge deck surface replacement and underside concrete repairs; $340,750.
1996 - 1997
NEW YORK STATE THRUWAY AUTHORITY− TAB 96−26C − HOLLEY GUARD GATES REHABILITATION, HOLLEY, NY: Prime Contract; remove 12 inches of deteriorated concrete and replace with reinforced concrete at center pier and structure abutments; rehabilitate drive machinery; replace suspension cables and counterweights; remove and replace structural steel; paint gates and towers; $916,000.
1996
MANNING SQUIRES HENNIG CO., INC. − CITY OF ROCHESTER, NY − RUNDEL LIBRARY ADDITION: Subcontract; place and finish 63,000 SF of lightweight aggregate concrete floors; construct 75 LF of 15 ft wide by 9 ft high concrete tunnel passageway beneath South Avenue; $704,415.
1996
U.C.C. CONSTRUCTORS, INC., REHABILITATION OF THREE GUARD
GATES, GASPORT, MEDINA & BROCKPORT, N.Y. − NYSTA: Subcontract; remove and replace 1,000 LF steel pipe handrails with cast iron bulb-type fittings to give structure relevant historic features; $100,000.
1994 - 1996
UNION CONCRETE AND CONSTRUCTION CORP.− ALBION, NY− NYSDOT: Subcontract; rehabilitate three lift lridges over NYS Barge Canal removal, refurbish or replacement of bridge drive machinery, sheaves and cables for three lift bridges, included cable tension equalization and span balancing; $2,165,000.
1994 - 1996
MILL STREET TUNNEL REHABILITATION AND INSTALLATION OF FIBER OPTIC COMMUNICATIONS SYSTEM INSTRUMENTATION AND CONTROL, PHASE III: (TWO SEPARATE PRIME CONTRACTS)
ROCHESTER PURE WATERS DISTRICT− MILL STREET TUNNEL: arch rock bolting, shotcrete and grouting to rehabilitate and stabilize existing tunnel; $600,000.
FIBER OPTIC: install 4 miles of fiber optic cable in existing tunnel included provided fiber optic equipment; $390,000.
1993 - 1996
KIEWIT CONSTRUCTION COMPANY− LEWISTON, NY
N.Y.S. POWER AUTHORITY−ROBERT MOSES NIAGARA POWER PLANT: Subcontract; provide access for concrete wall inspection. Involved erection of scaffolding and swinging work platform for inspection of concrete walls up to 115 L.F. high without access to top of the walls; $1,400,000.
1993 - 1995
THE LANE CONSTRUCTION CORP., CORNING, N.Y. NYSDOT−D254552− CORNING BY-PASS: Subcontract; furnish and install concrete foundations, also installed 140,000 SF of exposed aggregate precast concrete noise wall; $2,500,000.
1993 - 1995
KEELER CONSTRUCTION COMPANY− BATAVIA AND HAMLIN, NY− New York State Department of Transportation: Subcontract; bridge rehabilitation, remove and replace concrete including decks; $550,000.
|