2012

NEW YORK POWER AUTHORITY- UPPER HEAD GATE RAIL REFURBISHMENT
$872,6000 – Marek Kobialka, Construction Engineer
Prime Contract; refurbished upper head gate rail in bays 11 thru 13 which included removing rails and studs, refurbishing deteriorated paint and replacement of the system;

2011-2012

NEW YORK POWER AUTHORITY – NORTH ROCK FACE PROTECTION
$1,196,850 – Marek Kobialka, Construction Engineer
Prime Contract; project included remodel of rock slope, installation of rock anchors and new concrete retaining wall, installation of new rock fall protection system.

2011

NEW YORK POWER AUTHORITY – SPEEDS SAMPLING POINT
$93,000 – Charles Baker, Construction Engineer
Prime contract; project included providing and installing stairs, ladders, platforms, handrail, & anchor points.

2011  

NEW YORK POWER AUTHORITY – SWITCH YARD FOUNDATION REPAIR
 $131,475 – Marek Kobialka, Construction Engineer
Prime Contract; shored and fixed broken foundation on multiple types of foundations, while meeting stringent guidelines.

2011

CATCO (CONCRETE APPLIED TECHNOLOGIES CORP.) – NYSDOT D261457 RESTORATION AND REHABILITATION ON I-86 BETWEEN EXITS 16 AND 17
$118,200
Subcontract; performed structural lifting of bridge girders, bearing replacements, and related steel work.

2010-2011

SEALAND CONTRACTORS CORP – NYSDOT D261415 – REHABILITATION OF ROUTES I-590 AND 104
$323,000
Subcontract; removed existing and installed new overhead sign structures over expressways

2010

ROCHESTER GAS AND ELECTRIC CORP. – REMOVAL AND REPLACEMENT OF GATE 2 AT CENTRAL AVENUE DAM
$590,000
Prime contract; work included providing cofferdams and repairing pier concrete

2010

NEW YORK POWER AUTHORITY – ROBERT MOSES DAM CONCRETE FACE REHABILITATION AT OVERHEAD HIGH VOLTAGE CONDUCTORS
$1,335,000
Prime contract; project included providing all access to accomplish necessary concrete repair work within a short mandated available schedule.

2010

NEW YORK POWER AUTHORITY – ROBERT MOSES DAM CONCRETE FACE REHABILITATION AT OVERHEAD HIGH VOLTAGE CONDUCTORS
$1,335,000. Edward Szpala, Construction Engineer
Prime contract; project included providing all access to accomplish necessary concrete repair work within a short mandated available schedule.

2010

UNION CONCRETE AND CONSTRUCTION CORP. – NEW YORK STATE DEPARTMENT OF TRANSPORTATION – D260558 ERIE COUNTY NATURE PRESERVE SIGNS AT FUHRMANN BOULEVARD (ROUTE 5) RECONSTRUCTION PROJECT
Subcontract $120,000
Constructed park entrance signs of dry lay rubble stone masonry using bluestone.

2009-2010

TIOGA CONSTRUCTION COMPANY – NEW YORK STATE THRUWAY AUTHORITY PROJECT: TAS-08-8C/D213758 – REHABILITATION OF LOCK 05, TOWN OF MINETTO, AND LOCK 08, TOWN OF OSWEGO, OSWEGO COUNTY, N.Y.
Subcontract, $1,250,000

  • Furnished and installed quoin plates and pivot
  • Furnished quoin socket (to be installed by others)
  • Furnished and installed quoin and miter timbers
  • Removed and rehabilitated drive machinery, counterweight, and drive chains
  • Furnished and installed 650 feet of handrail with cast iron “bulb fittings” to give the structure relative historic features
  • Rehabilitated machinery cabinets to appropriate historic standards
2008-2010

AMERICAN BRIDGE COMPANY – NEW YORK STATE THRUWAY AUTHORITY
PROJECT: TAN-08-30B – REHABILITATION OF SOUTH GRAND ISLAND BRIDGES
Subcontract, $6,200,000

  • Performed concrete repair at all bridge substructures
2009

YARUSSI CONSTRUCTION, INC.
PROJECT: NIAGARA COUNTY EMERGENCY REPAIR OF WILSON BURT ROAD BRIDGE AND EIGHTEEN MILE CREEK
Subcontract, $274,000

  • Furnished and erected steel support system to support bridge span over reservoir where concrete pier was failing
2008-2009

SEALAND CONTRACTORS CORPORATION – NEW YORK STATE DEPARTMENT OF TRANSPORTATION
PROJECT: D260481 – REHABILITATION AND RECONSTRUCTION ON I-490
Subcontract, $325,000

  • Erected all new overhead sign structures and removed existing overhead sign structures
2007-2009

TIOGA CONSTRUCTION COMPANY – NEW YORK STATE THRUWAY AUTHORITY
PROJECT: 07-20C/D213616 – REHABILITATION OF MOVEABLE DAM 10 AT LOCK E-14
Subcontract, $436,000

  • Fabricated and installed steel stairs, ladders, and handrail with cast iron “bulb type” fittings to give structure relative historic features
2007-2009

NEW YORK STATE THRUWAY AUTHORITY
PROJECT: 07-58C/D213752

Prime contract, $908,000

  • Fabricated and delivered 175 7 by 20 by 2 feet dredge pipe pontoons
2004-2009

CD PERRY AND SONS, INC. – NEW YORK STATE THRUWAY AUTHORITY
PROJECT: TAA 04-29C – REHABILITATION OF MOVEABLE DAM 6 AT LOCK E-10 AT ERIE CANAL M.P. E-189.18

Subcontract, $360,000

  • Furnished and installed 2,000 LF of handrail with cast iron “bulb type” fittings to give structure relative historic features
2008

CRANE HOGAN STRUCTURAL SYSTEMS, INC. – NEW YORK STATE DEPARTMENT OF TRANSPORTATION
PROJECT: D260586

Subcontract, $105,000

  • Erected new steel girders for Route 96 bridge across Ontario Central Railroad
2008

COLD SPRING CONSTRUCTION COMPANY – NEW YORK STATE DEPARTMENT OF TRANSPORTATION
PROJECT: D260140 – CONSTRUCTION OF U.S. ROUTE 219
Subcontract, $150,000

  • Placed shotcrete around steel arch abutments of new bridge over Cattaraugus Creek and gorge
  • Shotcrete was used to protect weak shale from weather
2008

CONSTELLATION ENERGY – GINNA NUCLEAR PLANT – CSB UTILITY WORK

Prime contract, $508,000

  • Utility modification and removal
  • Sitework required as part of project modifying contaminated storage building
2008

CRANE HOGAN STRUCTURAL SYSTEMS, INC. – NEW YORK STATE DEPARTMENT OF TRANSPORTATION
PROJECT: D260586
Subcontract, $105,000

  • Erected new steel girders for Route 96 bridge across Ontario Central Railroad
2008

MONROE COUNTY, N.Y.
PROJECT: REDMAN ROAD CULVERTS

Prime contract, $187,000

  • Furnished and installed two new precast concrete structures
2008

ROCHESTER GAS AND ELECTRIC
PROJECT: STATION 5 SECTOR GATE 3
Prime contract, $440,000

  • Rehabilitated and performed upgrades for 17 foot high by 100 foot long sector gate at Station 5 dam
  • Performed steel, mechanical, and concrete modifications and new construction
2008

AMTHOR STEEL
PROJECT: CHILDREN’S DAYCARE CENTER FOR CORNING, INC.

Subcontract, $138,500

  • Erected structural steel for new children’s center
2008

DANSFORTH MECHANICAL SERVICES – MONROE COUNTY
PROJECT: NORTHWEST QUADRANT WASTEWASTER TREATMENT PLANT AUXILLARY CONTRIFUGE INSTALLATION
Subcontract, $100,000

  • Constructed a new reinforced concrete mezzanine floor for new equipment
2008

BOUGHTON PARK CORPORATION
PROJECT: BOUGHTON PARK DAM REHABILITATION
Prime contract, $158,000

  • Repaired concrete spillways and training walls utilizing concrete and cast in place concrete
2008

TOWN OF RUSH, N.Y.
PROJECT: RUSH DAM EMERGENCY REPAIRS
Prime contract, $163,000

  • Drilled and placed grout into dam and dam apron to fill existing voids
  • Repaired concrete surface spalls and reconstructed dam abutment
2006-2008

TIOGA CONSTRUCTION COMPANY – NEW YORK STATE THRUWAY AUTHORITY
PROJECT: TAS-06-32C/D213513 – REHABILITATION OF DAM AT LOCK E-26 ON THE ERIE CANAL
Subcontract, $225,000

  • Installed the control gate seals and drive machinery
  • Furnished and installed 750 LF of handrail with cast iron “bulb type” fittings to give structure relative historic features
2004-2007

CRANE HOGAN STRUCTURAL SYSTEMS, INC. – NEW YORK POWER AUTHORITY
PROJECT: ROBERT MOSES POWER PLANT

Subcontract, $3,975,000

  • Formed and poured over 60,000 SF of vertical and sloped wall patches and over 1,950 LF of vertical and sloped joints with self-consolidating concrete
  • All work was completed from mast climbing scaffolds and suspended scaffolds
2007

NEW YORK POWER AUTHORITY
PROJECT: DRAINAGE TUNNELS DRAINAGE IMPROVEMENTS

Prime contract, $443,000

  • Drilled overhead 3-inch-diameter holes into surrounding rock up to 300 LF long
2007

YARUSSI CONSTRUCTION, INC. – NIAGARA FALLS BRIDGE COMMISSION
PROJECT: WHIRLPOOL BRIDGE ACROSS NIAGARA RIVER
Subcontract, $261,090

  • Rehabilitated historic stone abutment for steel arch bridge with 75 cm of shotcrete
2007

KEELER CONSTRUCTION COMPANY – NEW YORK STATE DEPARTMENT OF TRANSPORTATION
PROJECT: D260462 – I-390 GENESEE EXPRESSWAY REHABILITATION, DANSVILLE, N.Y.
Subcontract, $207,000

  • Rehabilitated interstate bridges in multiple locations, including concrete replacement, sheet applied waterproofing membrane, and curb replacement
  • Furnished the modular expansion joints
2007

MONROE COUNTY, N.Y.
PROJECT: DOPPLER VOR/DME FACILITY AT GREATER ROCHESTER INTERNATIONAL AIRPORT

Prime contract, $800,000

  • Furnished and installed a 120’ diameter steel structure to support 50 radar antennae used for aircraft navigation
2007

MONROE COUNTY, N.Y.
PROJECT: DOPPLER VOR/DME FACILITY AT GREATER ROCHESTER INTERNATIONAL AIRPORT

Prime contract, $800,000

  • Furnished and installed a 120’ diameter steel structure to support 50 radar antennae used for aircraft navigation
2007

MONROE COUNTY, N.Y.
PROJECT: GILMORE BRIDGE REPLACEMENT

Prime contract, $420,000

  • Reconstructed a portion of Gilmore Road in Brockport, N.Y., including the construction of a precast bridge structure
2007

HAYNER HOYT CORPORATION
PROJECT: ST. JOSEPH’S HOSPITAL PARKING GARAGE REHABILITATION

Prime contract, $265,000

  • Removed asphalt overlay and hot applied waterproofing membrane and replaced with concrete infill on all ramp surfaces
  • Removed and replaced all ramp curbs
  • Performed full depth concrete deck repairs
2007

CRANE HOGAN STRUCTURAL SYSTEMS, INC.
PROJECT: WILSON HOPSITAL PARKING GARAGE REPAIRS, JOHNSON CITY, N.Y.

Subcontract, $146,000

  • Rehabilitated precast concrete T-beams and C.I.P. concrete columns with wet-mix shotcrete
2006

WEGMANS FOOD MARKETS
PROJECT: MARKET STREET NOISE BARRIER CONSTRUCTION

Prime contract, $353,000

  • Installed drilled shaft foundations
  • Furnished and installed 5,750 SF of precast noise wall with architectural finish
2006

CRANE HOGAN STRUCTURAL SYSTEMS, INC.
PROJECT: RG&E REPLACEMENT OF CENTRAL AVENUE GATE 5 ON GENESEE RIVER

Subcontract, $191,000

  • Removed and replaced the #5 control gate at the RG&E Station 2 headgate, including the replacement of the old guide system
2006

MONROE COUNTY
PROJECT: HOLT ROAD CULVERT REPLACEMENT

Prime contract, $256,000

  • Reconstructed a portion of Holt Road in Webster, N.Y., including placement of a precast concrete box culvert
2006

UCC CONSTRUCTORS, INC. – NEW YORK STATE DEPARTMENT OF TRANSPORTATION
PROJECT: D260055 – INSTALLATION AND REMOVAL OF OVERHEAD SIGN STRUCTURES IN MONROE COUNTY, N.Y.

Subcontract, $110,000

  • Removed and replaced overhead sign structures
2006

CD PERRY AND SONS, INC. – NEW YORK STATE DEPARTMENT OF TRANSPORTATION
PROJECT: D260004 – REHABILITATION OF ROUTE 378 BRIDGE OVER THE HUDSON RIVER

Subcontract, $72,000

  • Performed concrete repairs using wet-mix shotcrete on the bridge piers
2006

ECONOMY PAVING COMPANY, INC.
PROJECT: MINETTO BRIDGE ROAD OVER THE OSWEGO BARGE CANAL AND OSWEGO RIVER

Subcontract, $105,000

  • Performed concrete repairs with wet-mix shotcrete
  • Cored holes in concrete approach slab for the installation of micro piles
  • Jacked existing approach slab
  • Created a retaining wall using shotcrete and grouted the approach slab to mitigate settling
2006

CRANE HOGAN STRUCTURAL SYSTEMS, INC. – NEW YORK STATE DEPARTMENT OF TRANSPORTATION
PROJECT: D259683 – REHABILITATION OF MOUNT READ BOULEVARD OVER KODAK PARK, ROCHESTER, N.Y.

Subcontract, $86,000

  • Performed overhead demolition and replacement of bridge deck with shotcrete
2006

HOHL INDUSTRIAL SERVICES, INC. – NEW YORK STATE DEPARTMENT OF TRANSPORTATION
PROJECT: D259852 – REHABILITATION OF INGERSOLL STREET AND WASHINGTON STREET LIFT BRIDGES OVER ERIE CANAL, BATAVIA, N.Y.

Subcontract, $475,000

  • Performed concrete removal and replacement using self-consolidating concrete
  • Cast in place counterweights for both lift bridges
2006

MONROE COUNTY
PROJECT: REPLACEMENT OF NORTH GREECE ROAD BRIDGE

Prime contract, $245,000

  • Furnished and installed precast box structure
2006

CRANE HOGAN STRUCTURAL SYSTEMS, INC. – CITY OF ROCHESTER, N.Y.
PROJECT: GENESEE RIVERWAY TRAIL PROJECT – TURNING POINT PARK TO THE O’RORKE BRIDGE – ROCHESTER, N.Y.

Subcontract, $348,000

  • Prefabricated and installed 86 steel span units over the Genesee River
  • Used a helicopter to place spans in environmentally sensitive areas where access for standard lifting equipment was not available
2005

R&S RAILROAD
PROJECT: RECONSTRUCTION OF RAILROAD CROSSING OVER NEW YORK STATE ROUTE 408 IN MOUNT MORRIS, N.Y.

Prime contract, $30,000
  • Removed existing railroad crossing and replaced with a reinforced concrete slab crossing
2005

CRANE HOGAN STRUCTURAL SYSTEMS, INC.
PROJECT: RIVER STREET WATERFRONT PUBLIC IMPROVEMENTS

Subcontract, $348,000

  • Installed ceramic-faced concrete block interior walls for boater’s service building
  • Erected segmental block retaining walls along the shoreline and parking area
  • Installed both brick and exposed aggregate sidewalks, including detectable warning system at the crosswalks
2005

CRANE HOGAN STRUCTURAL SYSTEMS, INC. – NEW YORK STATE DEPARTMENT OF TRANSPORTATION
PROJECT: D259637 – RECONSTRUCTION OF ROUTE 104
Subcontract, $965,000

  • Installed precast concrete “T” walls, segmental block retaining walls, and mechanically stabilized segmental block retaining walls
  • Work included excavation and backfill
2005

YARUSSI CONSTRUCTION, INC. – NIAGARA FALLS BRIDGE COMMISSION
PROJECT: U.S. RAINBOW BRIDGE BEARING REPLACEMENT

Subcontract, $194,300

  • Demolished concrete on the pier legs and arches and replaced with either Class A or Class D concrete
2005

LUPINI CONSTRUCTION, INC. – NYSOGS
PROJECT: 41777-C – ATTICA PRISON REHABILITATION

Subcontract, $15,000

  • Removed train doors and hardware from both ends of the truck lock
2005

HAYWARD BAKER – EASTMAN KODAK COMPANY
PROJECT: HAWKEYE SLOPE STABILIZATION

Subcontract, $24,000

  • Utilized shotcrete to place concrete pads on a vertical rock face for use with rock anchors
  • All of the access was provided by a crane with a man basket
2005

ROCHESTER GAS AND ELECTRIC
PROJECT: STATION 2 REHAB

Prime contract, $90,870

  • Replaced structural steel supports and repaired concrete supports with both CIP concrete and shotcrete
2005

LECHASE CONSTRUCTION SERVICES, LLC
PROJECT: PARK RIDGE HOSPITAL ADDITIONS AND ALTERATIONS FOR THE EMERGENCY CENTER

Subcontract, $322,000

  • Installed a precast concrete façade for three new hospital building additions
2005

THE LANE CONSTRUCTION CORPORATION – NEW YORK STATE DEPARTMENT OF TRANSPORTATION
PROJECT: D259453 – RECONSTRUCTION OF ROUTE 17 IN THE VILLAGE AND TOWN OF HORSEHEADS, N.Y.

Subcontract, $1,796,680

  • Erected 7,310 SM of precast concrete noise wall
2005

DANT CLAYTON CORPORATION – CITY OF ROCHESTER, N.Y.
PROJECT: PAETEC PARK

Subcontract, $320,000

  • Installed the bleacher risers, seating, aisle way stairs, and front skirting
2004-2005

OAKGROVE CONSTRUCTION, INC. – NEW YORK STATE DEPARTMENT OF TRANSPORTATION
PROJECT: D25953 – MILLING AND RESURFACING OF ROUTE I-290 IN TOWNS OF TONAWANDA AND AMHERST, N.Y.

Subcontract, $1,149,000

  • Removed deteriorated concrete from twelve bridge substructures and replaced with shotcrete
  • Made over 1,000 SM of repairs on overpass and underpass abutments and piers along an 8 km stretch of Interstate 290
2000-2005

CRANE HOGAN STRUCTURAL SYSTEMS, INC. – MONROE COUNTY, N.Y.
PROJECT: O’RORKE BRIDGE CONSTRUCTION PROJECT, ROCHESTER, N.Y.

Subcontract, $1,217,545

  • Provided survey control for locating and embedding in concrete supports and Scherzer track castings
  • Installed and aligned all drive machinery, machinery supports, and tail locks
  • Performed engineering calculations and constructed reinforced 380 CM concrete counterweights in a phased process that balanced bascule steel during erection stages
2002-2004

KEELER CONSTRUCTION COMPANY – NEW YORK STATE DEPARTMENT OF TRANSPORTATION
PROJECT: D259177 – RECONSTRUCTION OF RT. 31 IN THE VILLAGE OF HOLLEY, N.Y.

Subcontract, $442,000

  • Placed over 1,350 SM of brick paved sidewalks and driveways
  • Installed a segmental block retaining wall
  • Milled existing pavement and pour-stamped, colored concrete crosswalks
2001-2004

VILLAGER CONSTRUCTION, INC. – NEW YORK STATE DEPARTMENT OF TRANSPORTATION
PROJECT: D258746 – ROUTE 21 & 31 OVERLAP IN THE VILLAGE OF PALMYRA, N.Y.

Subcontract, $349,680

  • Rehabilitated downtown Palmyra, N.Y., including over 1,200 SM of precast concrete pavers and 1,500 SM of exposed aggregate concrete sidewalk and crosswalks
2004

VILLAGE OF LYONS, N.Y.
PROJECT: MONTEZUMA STREET BRIDGE REPLACEMENT

Prime contract, $102,000

  • Removed and disposed of existing bridge and replaced it with precast concrete span units
2004

KEELER CONSTRUCTION COMPANY – NEW YORK STATE DEPARTMENT OF TRANSPORTATION
PROJECT: D259415 – RECONSTRUCTION OF ROUTE 252 AND ROUTE 383 INTERSECTION

Subcontract, $677,000

  • Installed a wire mesh retaining wall with CIP concrete face
  • Erected a precast concrete noise wall
2004

CRANE HOGAN STRUCTURAL SYSTEMS, INC. – NEW YORK STATE DEPARTMENT OF TRANSPORTATION
PROJECT: D259477 – BRIDGE REHABILITATION PROJECT FOR VARIOUS BRIDGES ON INTERSTATE 81 & 690, SYRACUSE, N.Y.

Subcontract, $87,000

  • Applied shotcrete to an I-81 bridge abutment
2004

CRANE HOGAN STRUCTURAL SYSTEMS, INC. – MONROE COUNTY WATER AUTHORITY
PROJECT: SITE ACCESS IMPROVEMENTS PROJECT NO. 01-S05

Subcontract, $95,000

  • Sounded existing concrete and made necessary repairs
  • Used shotcrete and cast-in-place methods
2003-2004

SPRINGLAKE INDUSTRIAL AND MARINE
PROJECT: CROSS IRONDEQUOIT PUMP STATION WELL MODIFICATIONS

Subcontract, $105,000

  • Constructed new reinforced concrete Ogee profile to speed up flow of sewer
2003

YARUSSI CONSTRUCTION, INC.
PROJECT: PORTER ROAD BRIDGE OVER GILL CREEK

Subcontract, $180,000

  • Removed deteriorated concrete from underside of arch and replaced it with shotcrete
  • Reconstructed the top 5 inches of deck surface with new concrete overlay
2003

NEW YORK POWER AUTHORITY
PROJECT: LEWISTON ROAD BRIDGE OVER RMNPP JOINT REPAIR

Subcontract, $42,000

  • Repaired various roadway deck joints
2002-2003

OAKGROVE CONSTRUCTION, INC. – NEW YORK STATE DEPARTMENT OF TRANSPORTATION
PROJECT: D258788 – REHABILITATION OF 8 BRIDGES ON I-190 IN NIAGARA COUNTY, N.Y.

Subcontract, $261,000

  • Removed deteriorated concrete and replaced with shotcrete
2002

NEW YORK STATE THRUWAY AUTHORITY
PROJECT: TAB 02-28C / D213199 – REHABILITATION OF CULVERT 54

Prime contract, $740,717

  • Emergency contract to grout voids in the Erie Canal
  • Installed cofferdams
  • Drilled and grouted in canal basin and culvert 54
2001-2002

CRANE HOGAN STRUCTURAL SYSTEMS, INC. – NEW YORK STATE THRUWAY AUTHORITY
PROJECT: TAB 99-43C / D212699 – REHABILITATION OF LOCK E34 AND E35, LOCKPORT, N.Y.

Subcontract, $1,300,000

  • Removed and rehabilitated drive machinery and concrete counterweight
  • Drove chains
  • Installed buffer beam
2001

WYOMING COUNTY
PROJECT: ALMETER ROAD BRIDGE REPLACEMENT

Prime contract, $372,475

  • Removed existing culvert and replaced with precast concrete box culvert sections
 2001

OAKGROVE CONSTRUCTION, INC. – NEW YORK STATE THRUWAY AUTHORITY
PROJECT: TAB 00-45 / D212926 – REHABILITATION OF I-90 FOURTH LANE PROJECT

Subcontract, $449,603

  • Installed a “mechanically stabilized earth retaining wall system”
2001

KEELER CONSTRUCTION COMPANY – NEW YORK STATE DEPARTMENT OF TRANSPORTATION
PROJECT: D258530 – REPLACEMENT OF ROUTE 15A IN LIVONIA, N.Y. AND ROUTE 31 IN GATES, N.Y.

Subcontract, $130,821

  • Installed box culvert sections at two locations
2001

MANNING SQUIRES HENNIG CO., INC. – CITY OF ROCHESTER
PROJECT: NEW ROCHESTER PUBLIC SAFETY BUILDING

Subcontract, $861,211

  • Installed limestone façade, pavers, retaining walls, fencing, landscaping, and trash receptacles
2000

CRANE HOGAN STRUCTURAL SYSTEMS, INC.
PROJECT: CITY OF SYRACUSE MONY PLAZA PARKING GARAGE REPAIRS

Subcontract, $350,000

  • Applied 17,500 SF of overhead shotcrete to repair garage structure
1999

NEW YORK STATE THRUWAY AUTHORITY
PROJECT: TAB 99-76C / D212766 – REHABILITATION OF BUSHNELL’S BASIN AND CARTERSVILLE GUARD GATES

Prime contract, $1,916,416

  • Removed 12 inches of deteriorated concrete and replaced it with reinforced concrete at center pier and structure abutments
  • Rehabilitated drive machinery
  • Replaced suspension cables and counterweights
  • Removed and replaced structural steel
  • Painted gates and towers
1999

NEW YORK STATE DEPARTMENT OF TRANSPORTATION
PROJECT: D258089 – REPLACEMENT OF THE DENSMORE ROAD BOX CULVERT OVER SANDY CREEK IN THE TOWN OF GAINES, N.Y.

Prime contract, $417,942

  • Removed and replaced existing box culvert and water diversion structure
  • Performed paving and site restoration
1999

KEELER CONSTRUCTION COMPANY – NEW YORK STATE DEPARTMENT OF TRANSPORTATION
PROJECT: D257980 – REPLACEMENT OF THREE BRIDGES OVER OTTER CREEK IN ORLEANS COUNTY, N.Y.

Subcontract, $532,298

  • Placed invert slab concrete, wingwalls, and precast box section at three locations
1999

CRANE HOGAN STRUCTURAL SYSTEMS, INC. – NEW YORK STATE THRUWAY AUTHORITY
PROJECT: TAB 99-39C – REHABILITATION OF COURT STREET DAM IN MONROE COUNTY, N.Y.

Subcontract, $100,000

  • Removed and installed new components for wier system, prop system, wire ropes, and connections
1998-1999

OAKGROVE CONSTRUCTION, INC. – NEW YORK STATE THRUWAY AUTHORITY
PROJECT: TAN 97-91 / D212459 – REHABILITATION OF I-190 NIAGARA SECTION OF NEW YORK STATE THRUWAY IN BUFFALO, N.Y.

Subcontract, $388,360

  • Poured concrete footings and walls
  • Removed deteriorating substructure concrete and placed repair concrete
1998-1999

SEALAND CONTRACTORS CORP. – NEW YORK STATE THRUWAY AUTHORITY
PROJECT: TAN 98-23 / D212506 – REHABILITATION OF I-190 NEW YORK STATE THRUWAY AUTHORITY IN BUFFALO, N.Y.

Subcontract, $308,822

  • Poured concrete footings and walls
  • Removed deteriorating substructure concrete and placed repair concrete on three bridges
  • Completed partial and full depth repairs on the mainline bridge decks
1998-1999

KEELER CONSTRUCTION COMPANY – NEW YORK STATE DEPARTMENT OF TRANSPORTATION
PROJECT: D257623 – REHABILITATION OF ROUTE 31 IN NIAGARA COUNTY

Subcontract, $475,244

  • Removed and replaced two precast box culverts
  • Placed sidewalks
  • Formed and placed concrete retaining wall
1998

NEW YORK STATE DEPARTMENT OF TRANSPORTATION
PROJECT: D257470 – REHABILITATION OF LAKE ONTARIO STATE PARKWAY BRIDGE OVER SALMON CREEK IN GREECE, N.Y.

Prime contract, $477,871

  • Supported existing bridge under traffic
  • Demolished existing piers and constructed new reinforced concrete piers
1998

MOLLENBERG-BETZ, INC. – CITY OF BUFFALO SCHOOLS
PROJECT: D257470 – CONVERSION OF EXISTING COAL BUNKERS IN BUFFALO, N.Y.

Subcontract, $246,516

  • Repaired deteriorated concrete of existing coal bunkers with shotcrete
1998

HERBERT F. DARLING, INC. – NEW YORK STATE THRUWAY AUTHORITY
PROJECT: D257470 – REHABILITATION OF LOCK E-35 ON THE ERIE CANAL IN LOCKPORT, N.Y.

Subcontract, $550,000

  • Formed and placed concrete in lock walls up to 46 feet high
1997

NYSDOT
PROJECT: D257284 – REHABILITATION OF TRI-WAY BRIDGE OVER THE ERIE CANAL IN LOCKPORT, N.Y.

Prime contract, $340,750

  • Performed bridge deck surface replacement and underside concrete repairs
1996-1997

NEW YORK STATE THRUWAY AUTHORITY
PROJECT: TAB 96-26C – HOLLEY GUARD GATES REHABILITATION, HOLLEY, N.Y.
Prime contract, $916,000

  • Removed 12 inches of deteriorated concrete and replaced with reinforced concrete at center pier and structure abutments
  • Rehabilitated drive machinery
  • Replaced suspension cables and counterweights
  • Removed and replaced structural steel
  • Painted gates and towers
1996

MANNING SQUIRES HENNIG CO., INC. – CITY OF ROCHESTER, N.Y.
PROJECT: RUNDEL LIBRARY ADDITION
Subcontract, $704,415

  • Placed and finished 63,000 SF of lightweight aggregate concrete floors
  • Constructed 75 LF of 15 feet wide by 9 feet high concrete tunnel passageway beneath South Avenue
1996

U.C.C. CONSTRUCTORS, INC. – NEW YORK STATE THRUWAY AUTHORITY
PROJECT: REHABILITATION OF THREE GUARD GATES, GASPORT, MEDINA, AND BROCKPORT, N.Y.

Subcontract, $100,000

  • Removed and replaced 1,000 LF steel pipe handrails with cast iron bulb-type fittings to give structure relative historic features
1994-1996

UNION CONCRETE AND CONSTRUCTION CORPORATION – NEW YORK STATE DEPARTMENT OF TRANSPORTATION
PROJECT: ALBION, N.Y.

Subcontract, $2,165,000

  • Rehabilitated three lift bridges over NYS Barge Canal
  • Refurbished and replaced bridge drive machinery, sheaves, and cables for three lift bridges
  • Performed cable tension equalization and span balancing
1993-1996

KIEWIT CONSTRUCTION COMPANY – NEW YORK STATE POWER AUTHORITY
PROJECT: ROBERT MOSES NIAGARA POWER PLANT, LEWISTON, N.Y.

Subcontract, $1,400,000

  • Provided access for concrete wall inspection
  • Involved erection of scaffolding and swinging work platform for inspection of concrete walls up to 115 LF high without access to top of the walls
1993-1995

THE LANE CONSTRUCTION CORPORATION – NEW YORK STATE DEPARTMENT OF TRANSPORTATION
PROJECT: D254552 – CORNING BY-PASS, CORNING, N.Y.

Subcontract, $2,500,000

  • Furnished and installed concrete foundations
  • Installed 140,000 SF of exposed aggregate precast concrete noise wall
1993-1995

KEELER CONSTRUCTION COMPANY – NEW YORK STATE DEPARTMENT OF TRANSPORTATION
PROJECT: BATAVIA, N.Y. AND HAMLIN, N.Y.

Subcontract, $550,000

  • Rehabilitated bridge
  • Removed and replaced concrete, including decks