A list of significant representative projects completed or projects currently under construction.

2017

UPPER HEAD GATE RAILS REFURBISHMENT

  • Job: Prime Contract; refurbished upper head gate rails which included removing rails and studs, refurbishing deteriorated paint and replacement of the system.
  • Category: Waterway Structures Construction
  • Client: New York Power Authority
2016-2018

MASSENA ICE SLUICE GATE REMOVAL

  • Job: Prime Contract: Cofferdam installation, Demolition and Removal of the slucie gates, and pouring of concrete lifts.
  • Category: Waterway Structures Construction
  • Client: New York Power Authority
2018

RAINBOW FALLS SPILLWAY RESURFACING

  • Job: Repair/resurface concrete on deteriorated areas of the dam spillway.
  • Category: Waterway Structures Construction.
  • Client: RG&E / Iberdrola
2017

BAILEY AVE BRIDGES OVER CAZ CREEK & BUFFALO RIVER

  • Job: Erection of bridges over the buffalo river and caz creek.
  • Category: Bridge and Heavy Steel Construction
  • Client: City of Buffalo
2017

ERIE PROMENADE BRIDGE

  • Job: Erection of a pedestrian bridge in the city of Rochester.
  • Category: Bridge and Heavy Steel Construction
  • Client: City of Rochester
2016

PORTAGEVILLE ROCKFALL PROTECTION

  • Job: Installation of a rockfall protection system for American Bridge which included rock anchors, drape netting, and shotcrete.
  • Category: Structural Concrete Construction and Rehabilitation
2013

CITY OF AUBURN STATE DAM REHABILITATION

  • Job: Installation of cofferdams, removal of gates for rehab, installation of rock anchors, demolition of concrete, and forming and pouring of concrete.
  • Category: Waterway Structures Construction
2011

WEBSTER WATER TUNNEL SHAFT

  • Job: Cleaning, forming and form stripping, concrete placing and finish work for completing the cast in place concrete work of the shaft.
  • Category: Waterway Structures Construction
2010

ROBERT MOSES DAM CONCRETE FACE REHABILITATION AT OVERHEAD HIGH VOLTAGE

  • Job: The project included providing all access to accomplish necessary concrete repair work within a short mandated available schedule.
  • Category: Waterway Structures Construction
  • Client: New York Power Authority
2008

D260140 / CONSTRUCTION OF U.S. ROUTE 219

  • Job: Placed shotcrete around steel arch abutments of the new bridge over Cattaraugus Creek and gorge.
  • Category: Structural Concrete Construction and Rehabilitation
  • Client: New York State DOT
2004-2007

ROBERT MOSES POWER PLANT

  • Job: Formed and poured over 60,000 SF of vertical and sloped wall patches and over 1,950 LF of vertical and sloped joints with self-consolidating concrete.
  • Category: Waterway Structures Construction
  • Client: New York Power Authority
2007

DOPPLER VOR/DME FACILITY AT GREATER ROCHESTER INTERNATIONAL AIRPORT

  • Job: Furnished and installed a 120′ diameter steel structure to support 50 radar antennae used for aircraft navigation.
  • Category: Bridge and Heavy Steel Construction
  • Client: Monroe County DOT
2006

MARKET STREET NOISE BARRIER CONSTRUCTION

  • Job: Furnished and installed 5,750 SF of precast noise wall with an architectural finish.
  • Category: Structural Concrete Construction and Rehabilitation
2006

GENESEE RIVERWAY TRAIL PROJECT / TURNING POINT PARK TO THE O’RORKE BRIDGE / ROCHESTER, N.Y.

  • Job: Prefabricated and installed 86 steel span units over the Genesee River. Used a helicopter to place spans in environmentally sensitive areas where access for standard lifting equipment was not available.
  • Category: Bridge and Heavy Steel Construction
  • Client: City of Rochester
2005

U.S. RAINBOW BRIDGE BEARING REPLACEMENT

  • Job: Demolished concrete on the pier legs and arches and replaced with either Class A or Class D concrete.
  • Category: Structural Concrete Construction and Rehabilitation
  • Client: Niagara Falls Bridge Commission
2005

RECONSTRUCTION OF ROUTE 17 IN THE VILLAGE AND TOWN OF HORSEHEADS, N.Y.

  • Job: Erected 7,310 SM of precast concrete noise wall.
  • Category: Structural Concrete Construction and Rehabilitation
  • Client: New York State DOT
2000-2005

O’RORKE BRIDGE CONSTRUCTION PROJECT, ROCHESTER, N.Y

  • Job: Provided survey control for locating and embedding in concrete supports and Scherzer track castings. Installed and aligned all drive machinery, machinery supports, and tail locks. Performed engineering calculations and constructed reinforced 380 CM concrete counterweights in a phased process that balanced bascule steel during erection stages.
  • Category: Bridge and Heavy Steel Construction
  • Client: Monroe County DOT
2002

TAB 02-28C / D213199 / REHABILITATION OF CULVERT 54

  • Job: Emergency contract to grout voids in the Erie Canal. Installed cofferdams. Drilled and grouted in canal basin and culvert 54.
  • Category: Structural Concrete Construction and Rehabilitation
  • Client: New York State Thruway Authority
2001

TAB 00-45 / D212926 / REHABILITATION OF I-90 FOURTH LANE PROJECT

  • Job: Installed a mechanically stabilized earth retaining wall system.
  • Category: Structural Concrete Construction and Rehabilitation
  • Client: New York State Thruway Authority
1999

TAB 99-76C / D212766 / REHABILITATION OF BUSHNELL’S BASIN AND CARTERSVILLE GUARD GATES

  • Job: Removed 12 inches of deteriorated concrete and replaced it with reinforced concrete at center pier and structure abutments. Rehabilitated drive machinery.Replaced suspension cables and counterweights. Removed and replaced structural steel. Painted gates and towers.
  • Category: Bridge and Heavy Steel Construction
  • Client: New York State Thruway Authority